News   Apr 17, 2026
 707     0 
News   Apr 17, 2026
 1.5K     6 
News   Apr 17, 2026
 672     0 

Search results

  1. A

    Eglinton East LRT | Metrolinx

    advancing to 30% design means someone does want this and actively putting up money to speed up the process Scarborough residents want this
  2. A

    Eglinton East LRT | Metrolinx

    no Scarborough, especially east Scarborough definitely needs some sort of Transit station. it's a half hour bus ride from Morningside to the nearest subway station. Scarborough exist east of McCown too, but I'm not going to have these same arguments over and over. I want Sheppard extended and...
  3. A

    Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)

    we've seen entire stadiums get built in 3yrs - 1yr & half for what you said still sounds rediclous
  4. A

    Toronto Ontario Line 3 | Metrolinx

    as a Scarborough resident, where is Chinatown North? Bromley & Sheppard area, I'm 39yrs old and have never heard of a Chinatown North or anywhere being called Chinatown North. When ppl hear Chinatown, it's definitely Spadina
  5. A

    Eglinton East LRT | Metrolinx

    if there was a line that should be a monorail this does sound like the one. From my little knowledge of watching YouTube transit videos over the years, you get to build cheaper thinner columns for elevated rail. I'd assume that would bring down cost and speed up the times of build. Smaller...
  6. A

    Eglinton East LRT | Metrolinx

    Full TSP from day 1 Remove a few stops or Elevate the line
  7. A

    TTC: Scarborough Busway Construction (portion of the former Scarborough RT route)

    what if they wanted to go to or stop at anyone of the Busway stations?
  8. A

    Finch West Line 6 LRT

    So is that or would that be considered job done or mission accomplished? Not to say Metrolinx did a good job here but is 6 minutes off of the initial advertised travel time a success? what was the bus travel time before? capacity was greatly increased as well.
  9. A

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    The stop spacing on this line looks like the perfect use for a surface LRT, speaking from a novice pov neway
  10. A

    Toronto Ontario Line 3 | Metrolinx

    what's going on here, a streetcar is going to terminate here? is there some sort of loop?
  11. A

    TTC: Scarborough Busway Construction (portion of the former Scarborough RT route)

    was there ever a thought of extending the SRT and getting new rolling stock to continue making use of the infrastructure
  12. A

    Toronto Ontario Line 3 | Metrolinx

    What station is this for ?
  13. A

    Toronto Ontario Line 3 | Metrolinx

    T This bridge might be the coolest part of this project, or maybe it'll be the Don Valley crossing bridge section for me
  14. A

    Toronto Ontario Line 3 | Metrolinx

    Super duper thanks
  15. A

    Toronto Ontario Line 3 | Metrolinx

    picture #3 Where are the OL tracks going to be, the bridge is throwing me off. I still can't visualize this at certain sections
  16. A

    Toronto Ontario Line: Don Valley Station (was Science Centre Station) | 22.8m | 3s | Metrolinx | HDR

    anyone care to explain what are those white things in the 3rd pic are, they look like caps
  17. A

    Eastern Avenue Bridge/DVP Interchange

    why is this work needed? Is this part of larger scope of things

Back
Top