News   Apr 23, 2024
 167     0 
News   Apr 22, 2024
 904     0 
News   Apr 22, 2024
 294     0 

Search results

  1. O

    Ottawa Transit Developments

    This is ultimately less on OC Transpo and more on city council. A motion to freeze fares for a year was brought to council and rejected. What could OC Transpo's management possibly do about that? The same goes for a "free month" of service and whatnot. OC Transpo's management doesn't have the...
  2. O

    Ottawa Transit Developments

    The restraining rail adjustment is a mitigation to allow service to resume. It is in no way a part of the "permanent fix". A restraining rail (more commonly known as a "check rail") prevents a derailment from happening in the first place, so no the vehicle would not have already derailed. A...
  3. O

    Ottawa Transit Developments

    IIRC it was reported that the expected lifespan of the axle assemblies is 1.2 million km, so 60,000km is quite a lot lower.
  4. O

    Ottawa Transit Developments

    According to TRA (among others), this is pretty typical for light rail systems. (whether this applies to light metro systems disguised as light rail systems is unclear)
  5. O

    Ottawa Transit Developments

    There are no wayside detectors, and it was made clear that wayside detectors would not work due to the design of the bearings.
  6. O

    Moose Rail (National Capital Region)

    As mentioned, it serves a pretty important role in providing transit in Alta Vista, Uplands, Greenboro, and the general hospital. Plus it will be a part of the future Baseline BRT. Well no, not really. The Trillium Line dodges everything north of Walkley. The South Keys to Walkley stretch will...
  7. O

    Moose Rail (National Capital Region)

    Please leave the SE Transitway alone. It is more useful as a BRT than it ever will be as LRT, and it is unlikely that its capacity will ever reach a point where it needs to be upgraded beyond BRT. If Bayview really becomes an issue in the future, that's when we start talking about Bank Street...
  8. O

    Ottawa Transit Developments

    Alstom weren't obligated to bid on the project. They still put forward a design they said would work, and based on an existing train that had many of the same operational characteristics they are now trying to claim are "pushing the limits" of what LRVs can do. The city definitely should have...
  9. O

    Ottawa Transit Developments

    The estimate was recently revised, and including a ~$50M realignment to avoid the demolition of homes between Knoxdale and Hunt Club, the new estimate is $3.52B.
  10. O

    Ottawa Transit Developments

    Getting out to Barrhaven (Baseline to Fallowfield) requires traversing an area with very poor soil conditions. In addition, that cost bundles in two major road grade separations from the VIA line which will be done with or without the LRT (for $400M). From Fallowfield to Barrhaven Town Centre...
  11. O

    Ottawa Transit Developments

    Infrastructure takes years to build, and it's not like we're just going to give up and pack up the LRT any time soon. At this point it's been pretty well-established that the continuing operational issues are related to the poor execution of maintenance. It'll either improve over time or be...
  12. O

    Ottawa Transit Developments

    According to the original reddit post, it was turning right onto Riverside from Hunt Club, so it is on the right side of the road.
  13. O

    Ottawa Transit Developments

    Calling the 2013–15 upgrades a disaster is not the same as calling the Trillium Line [as a whole?] a disaster. A marginally longer trip time is not "disastrous". Also, the original vehicles are actually still sitting in the yard. They intended to sell them for scrap after no one would buy them...
  14. O

    Ottawa Transit Developments

    That seems a bit hyperbolic.. Sure it didn't end up reaching the target headways, but it was performing fine and was carrying more passengers than had been projected.
  15. O

    Ottawa Transit Developments

    This was Thursday's incident.
  16. O

    Montréal Transit Developments

    Ottawa's trains were assembled in Ottawa with parts manufactured in Hornell, Sorel-Tracy, and others. I think they're quite the same.
  17. O

    Ottawa Transit Developments

    Reminder: Alstom was also subcontracted to perform maintenance on these vehicles. I don't think it was Alstom who did that, but someone did. In any case, RTG was awarded the bid before the vehicle selection was done. They chose between Siemens and Alstom. i.e. Alstom had very little to do with...
  18. O

    Ottawa Transit Developments

    I don't really see how double tracking would help. They'll both use the same signaling tech, and I'm not sure the difference in acceleration will be significant (if any). But you expect them to double the scale of a massive capital investment solely for this purpose?
  19. O

    VIA Rail

    VIA is transferring ownership of the old M&O Subdivison to the Prescott-Russell Trail Corporation, though only the 74km of it that are located within Prescott-Russell. https://media.viarail.ca/en/node/38715 I think VIA was holding onto this in case of a high-speed rail plan?
  20. O

    Ottawa Transit Developments

    Line 1 is now expected to partially resume service this Friday, with full service expected by the end of the month:

Back
Top