    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    Understood. Just that sometimes mother Nature can throw curve balls. My thought would be what can be done (if possible and at what cost))as work continues gradually increasing volume out flows as work progress hopefully engineers have asked themselves this question.
  2. C

    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    Would I be correct to assume during construction, shore line stabilization, dredging and other steps needed to complete the work, will not interfere with volume flow levels and possible upstream backup.My question is what's the contingency plan for an event at least at the 2013 level or greater?
  3. C

    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    The July 2013 rain event, Lake Ontario high water levels, Houston impact from Hurricane Harvey and the rain this week in Windsor ON. The writing is on the wall! Hopefully, the decision makers will see the need to accelerate the work schedule.I wonder what are the contingency plans in the event...
  4. C

    East Bayfront

    Thanks... I see views are up!
  5. C

    East Bayfront

    Quite Tread,I am sure it will pick up.Maybe rename it East Bayfront. Let me be the first new resident of Aqualina to post on this site. Looking forward to moving into my south inner harbour view condo. Looks like late summer 2017 lower floors will take first occupants. Has anyone heard of the...