News   Jan 09, 2025
 1.5K     2 
News   Jan 09, 2025
 455     0 
News   Jan 09, 2025
 1.3K     0 

Search results

  1. D

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    It does have an extra pier on the south side of Eastern Avenue though. Does anyone know what the extra span is for? It looks too wide to be just a sidewalk.
  2. D

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    To add to the above response re: streetcar tracks on Queen. Despite the roads being the same width, the angle that the rail crosses the Dundas and Logan are more acute.so the spans are actually longer. That's why there's an even more complex design for the Ontario Line crossing/station at...
  3. D

    Collingwood Gateway Centre | 42.5m | 12s | Charis Developments | Richard Ziegler

    Is that Health and Wellness Village still supposed to happen? https://www.collingwoodtoday.ca/local-news/poplarraglan-development-aims-to-be-catalyst-for-collingwoods-future-5222935#:~:text=%E2%80%9CNot%20everyone%20can%20get%20to,in%20a%20very%20positive%20way.%E2%80%9D Poplar Sideroad is...
  4. D

    Toronto Ontario Line: Riverside-Leslieville Station | 15m | 2s | Metrolinx | HDR

    No pictures but glass panels for the noise wall are also going up south of Queen Street.
  5. D

    Coxwell Sanitary Trunk Sewer Bypass

    What's the landscaping supposed to be here? 10+ years ago it was a (very rough) sports field/track, I think connected with Rosedale High School, is that coming back?
  6. D

    Toronto 50 Wilson Heights Boulevard | 56.55m | 17s | Greenwin/Tridel/CreateTO | Kirkor

    I am really glad to see the commuter parking lot being redeveloped into greater housing but I do feel it is a bit of a lost opportunity. The connection between Subway and Bus at Wilson is some of the worst on the entire system. Several escalators to get from Subway, under Allen Road and then...
  7. D

    GO Transit: Construction Projects (Metrolinx, various)

    There's been a lot of visual progress on the Lakeshore East line near Queen Street E, with the upcoming closure noted above, retaining walls have been installed along the length of Jimmie Simpson and to the south of Queen as well. There are also supports going up for noise walls. Does anyone...
  8. D

    Cycling infrastructure (Separated bike lanes)

    It's paved under Queen Street as well and looks like the fence separating the rail line has been fully replaced. Not sure how far north the paving goes, I only saw it going south.
  9. D

    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    Tried looking for the construction plans for this section of Lake Shore, but couldn't find them. Does anyone if there's a plan to add a crossing to McCleary Park from Booth? Would really make pedestrian access from Eastern (and north) much safer.
  10. D

    Toronto Ontario Line: Riverside-Leslieville Station | 15m | 2s | Metrolinx | HDR

    I stand to be corrected but the construction we're currently seeing in the pictures above is all related to the GO lines. Construction has not begun on the Ontario Line Station yet. The current construction is all on the East side of the rail corridor. Plan above taken from the Metrolinx...
  11. D

    GO Transit: Construction Projects (Metrolinx, various)

    Some speculation from me on that, and this is without delving into any of the design drawings for this project and only looking at the pictures. There's probably some concerns about the hydraulic capacity of those culverts, to add the second track the culverts will need to be extended, the...
  12. D

    Toronto 898 Broadview Avenue | 20.31m | 6s | REVE DVMT | QBS Architects Inc

    As someone who currently lives in a modern 4 story building with 1 elevator (and 20 units), I can say anecdotally adding a 2nd elevator to a building of this size makes it completely uneconomical. And if it's not economical it won't get built and won't be accessible to anyone. In my building...
  13. D

    Toronto Bike Share

    It's been like this for a couple weeks now, slim pickings every day. For some reason the Chester bike station (Arundel) has had 10 or so e-bikes docked there out of power for a bout a month now.
  14. D

    Leslieville / Studio District

    Tim Hortons is moving into the location where this nice mural was (mural has been removed. Sad.) Replacing a Cannabis shop.
  15. D

    Toronto Crosstown LRT: Leaside Station | ?m | 1s | Metrolinx | Arcadis

    From the outside looking in, I'm guessing that the steps did not meet building standards. ie. either too steep, not enough railings, etc. The solution to make it a planting bed is clearly a compromise, one that I think will have ongoing maintenance issues. The smooth surface of the concrete...
  16. D

    Toronto Crosstown LRT: Leaside Station | ?m | 1s | Metrolinx | Arcadis

    Did they just throw topsoil on top of the concrete steps? If so then it won't be long until the topsoil washes away and the old steps re-emerge... I assume that's why it's grasses and there isn't a single tree planted.
  17. D

    Cycling infrastructure (Separated bike lanes)

    I like a lot of that in principle, and am all for making it safer for pedestrians and cyclists. One drawback I could see is that it would likely push more commuters to Queen which would add more left turns delaying 2 busier streetcar lines (501, 504) at that ramp. Perhaps a light could be...
  18. D

    Baycrest Park Improvements

    It seems like this is just the phase 1 build out right? I don't see a timeline for the full build out which appears to require the removal of the Highway on-ramp to allow for the new road to connect to Neptune Road. Unless there's an agreement in place with MTO, I would think that this won't...
  19. D

    Sheppard Line 4 Subway Extension (Proposed)

    Would make sense, and once you got that far you could extend it to Weston along Lawrence West. Becomes a good transfer point for anyone coming off the Kitchener Line as well as anyone from North York/Scarborough wanting to go to the airport with the UP.
  20. D

    Toronto Bike Share

    So the expanded station at Queen and Pape has some issues. They added a second row of docks in front of the original row. But if the front row is full of bikes you now need to lift a bike over the handlebars of the docked bikes to dock your bike. I witnessed someone struggle doing this the...

Back
Top