News   Jan 06, 2026
 274     0 
News   Jan 06, 2026
 327     0 
News   Jan 05, 2026
 663     0 

Search results

  1. R

    Toronto Ontario Line: Gerrard Station | 15.38m | 2s | Metrolinx | HDR

    Must be some reversed decision or community backlash? I remember some people talking as if the Pape bridge was close to being demolished. Either way good news.
  2. R

    Toronto Ontario Line: Gerrard Station | 15.38m | 2s | Metrolinx | HDR

    Is there still plans to demolish the Pape pedestrian bridge? Seeing it still up is a hopeful. I actually like it.
  3. R

    TTC: Electric and alternative fuel buses

    I mean , the biggest road block to trolleys would be the actual facilities. I assume the overhead wires would be the same as what the streetcars use? Actually streetcars use panto, so no. But we do have the overhead department at TTC. I remember David Miller was studying to bring back...
  4. R

    TTC: Electric and alternative fuel buses

    I mean , the biggest road block to trolleys would be the actual facilities. I assume the overhead wires would be the same as what the streetcars use? Actually streetcars use panto, so no. But we do have the overhead department at TTC. I remember David Miller was studying to bring back...
  5. R

    TTC: Flexity Streetcars Testing & Delivery (Bombardier)

    I think the benefits to having double end cars is a worthwhile investment. You save on not having loops. And everything doesn't have to happen at once. Double end cars, and as time goes on make the adjustments at the end of the line to accommodating them. By the time 30 years come around there...
  6. R

    TTC: Flexity Streetcars Testing & Delivery (Bombardier)

    You sure ION will get the same cars as they have now. They don't make them anymore. Unless Alstom reactivates production for such a small order. Would it be worth it? Has ION sent out a RFP or some document stating this?
  7. R

    TTC: Other Items (catch all)

    I agree. WFH is an overall win-win. Employees, productivity, environmental, etc. But I suspect the need to stimulate business in the downtown and to justify office leases was the reason to end WFH. I would stand behind the labour movement if they fought for WFH. Pocket lines and everything.
  8. R

    TTC: Other Items (catch all)

    We needed that information yesterday. Tell your company to work around you. Lol
  9. R

    TTC: Other Items (catch all)

    I don't see TTC fixing up older garages or making a downtown garage a priority. But from a core operational need, it should be looked at. I get the lack of space downtown, but as mentioned , a multi level garage could potentially help with land use. TTC also has situation where they lease too...
  10. R

    TTC: Other Items (catch all)

    Believe it or not, even with one person operation, they are still required to put the train in emergency and cut the power. But like you said, it's best to move on.
  11. R

    TTC: Other Items (catch all)

    I don't expect you to see the fundamental difference. As for how to cut the power while the train is moving, that tells me it's already going above your head.
  12. R

    TTC: Other Items (catch all)

    Again your wrong Dan. The first thing an operator is suppose do is cut the power. Theres a phone from there where they can call control. If too traumatized, sure stay in cab. But procedure is cut power, first. Always assume the person is alive, and for emergency personnel to get down safely...
  13. R

    TTC: Other Items (catch all)

    I have a family member was a subway operator. They don't have to stay in the cab. And I know they've had multiple jumpers over the years. Including being a chief supervisor. They help with evacuations. But they are explicitly told not to go down to track level. Only exception is if they are...
  14. R

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    Well, at least now it's doug that will have to answer for this , and any mess or delay as a result. That's assuming the province as officially taken over both expressways by now?
  15. R

    GTHA Transit Fare Integration

    I would like to see more one seat rides on cross border routes between Toronto and surrounding regions. Seamless travel, similar to the routes TTC had prior to TYSSE. Even if they last two years, they appear to really attract customers. Some progress on Miway taking over some TTC routes in the...
  16. R

    TTC: Electric and alternative fuel buses

    From Merx, looks like TTC wants 100% EV para transit buses. I'm actually surprised there sticking with this EV agenda, when everyone appears to be backing away from it.
  17. R

    Highway 401 Transit and Auto Tunnel

    403 was once proposed to connect to the 401 at 427/Hwy27. And eventually turn into the proposed Richview/Crosstown expressway along Eglinton. I would propose that Doug just to see his reaction of a highway going through is neighborhood. It would be funny to see him fight against that. It...
  18. R

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    Too stressful, imagine if they had demolished it.
  19. R

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    The transparency won't be around for much longer. When the province uploads the expressway ,expect to hear nothing. Enjoy what little information we do get. Also with the upload, they should also upload Lake Shore Blvd. Apparently that's the biggest hurdle to finalizing the upload. If the...
  20. R

    Toronto Ontario Line: Pape Station | ?m | ?s | Metrolinx | HDR

    Is there plans to rebuild Pape station bus terminal as is? Or will they make the bus terminal smaller? There's no need for the 72 Pape bus to enter, and of course no more 81 Throncliffe bus going in. Just the 25 Don Mills and 925 as the only routes at Pape stn?

Back
Top