News   Apr 17, 2026
 788     0 
News   Apr 17, 2026
 1.8K     6 
News   Apr 17, 2026
 745     0 

Search results

  1. SaugeenJunction

    Kitchener Kitchener Central Transit Hub | ?m | 2s | Metrolinx | WZMH

    This is the latest update. The goal is to start construction in October if the court ruling goes well. Lawyers for Kitchener encampment say removing encampment residents is a violation of rights
  2. SaugeenJunction

    GO Transit: Service thread (including extensions)

    That seems like a reasonable, conservative estimate. IIRC the previous pilot was seeing around 30 riders per trip get on/off at Stratford per trip by the end of service.
  3. SaugeenJunction

    GO Transit: Service thread (including extensions)

    For folks on this thread, right before the COVID pandemic there were persistent rumours that Metrolinx had negotiated bi-hourly (every 2 hour) service for the Milton and Richmond Hill Lines 7 days per week. That obviously never materialized, but just a reminder what the rumour mill thought was...
  4. SaugeenJunction

    Toronto Toronto Tempo Performance Centre | ?m | 1s | Kilmer | HOK

    LOL we both posted a thread for this pretty much at the same time. Thanks mods for combining it.
  5. SaugeenJunction

    Toronto Toronto Tempo Performance Centre | ?m | 1s | Kilmer | HOK

    Toronto Tempo WNBA team to build a training facility at Strachan and Lake Shore. More below: Toronto Tempo to Develop World-Class Performance Centre
  6. SaugeenJunction

    GO Transit: Service thread (including extensions)

    My hope is that the weekend Kitchener trains also call Stratford. Lots of yard space where GO could stable, building electrical hookups shouldn’t be too hard. Stratford was the busiest station on the London extension and was seeing about 30 boardings at its peak, during Covid.
  7. SaugeenJunction

    Toronto Forêt | 144.95m | 41s | Canderel | BDP Quadrangle

    A third excavator showed up today
  8. SaugeenJunction

    Waterloo Region Transit Developments (ION LRT, new terminal, GRT buses)

    Finally found some higher res updated renderings of the new transit hub. Source.
  9. SaugeenJunction

    GO Transit: Construction Projects (Metrolinx, various)

    Looks like works at Oakville GO are starting.
  10. SaugeenJunction

    Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    Notice from MX: Architectural and Landscaping Works
  11. SaugeenJunction

    Toronto Eglinton Line 5 + GO: Caledonia Station | 11.72m | 2s | Metrolinx | McCallum Sather

    Today, GO station progress is indeed occurring.
  12. SaugeenJunction

    Toronto Eglinton Line 5 + GO: Caledonia Station | 11.72m | 2s | Metrolinx | McCallum Sather

    For those photographing it, please don’t forget to take pictures of the GO Station progress!
  13. SaugeenJunction

    Toronto Alfie Condos | 119.73m | 34s | Madison Group | Superkül

    All the branding has been removed from the hoarding. Looks very dead to me.
  14. SaugeenJunction

    Toronto Pinnacle One Yonge | 351.85m | 106s | Pinnacle | Hariri Pontarini

    Absolute beast for our skyline, especially from Ookwemin Minising.
  15. SaugeenJunction

    Toronto Forêt | 144.95m | 41s | Canderel | BDP Quadrangle

    The last machine to show up is a piling rig, but it could very well just be hanging out.
  16. SaugeenJunction

    Toronto Pinnacle One Yonge | 351.85m | 106s | Pinnacle | Hariri Pontarini

    Making an impact on the skyline from Woodbine Beach

Back
Top