News   Apr 17, 2026
 766     0 
News   Apr 17, 2026
 1.7K     6 
News   Apr 17, 2026
 729     0 

Search results

  1. J

    Eglinton East LRT | Metrolinx

    This project is interesting because it's not really just one line. It will function like a network the way they have it outlined. Before any more steps are made the province must choose an alignment for Line 4. And provide a solution for the debacle they've orchestrated at Kennedy.
  2. J

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    They've been advertising on billboards that fare enforcement is happening on subway platforms for some time now, though I think it's more of a scare tactic as I've never seen it done.
  3. J

    Finch West Line 6 LRT

    I was on a Line 1 train between Rosedale and Bloor earlier and the train was losing power every few seconds it wasn't long after that they halted service between Bloor and Eglinton. The 512 was more reliable than Line 2 in the west end today, which was shut down much of the evening between St...
  4. J

    Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    Let's also bring back the bridge into Earlscourt Park. Virtually extends the path almost 1km. Shouldn't have been removed from the plan in the first place.
  5. J

    Finch West Line 6 LRT

    I find it odd that people correlate Finch West's bad performance with the viability of LRT as a whole. You can argue that it's executed poorly, but to argue that it's not a viable form of transit in the context of Toronto is uninformed. At the same time this argument is just as shortsighted...
  6. J

    Finch West Line 6 LRT

    As someone who takes the 512 daily. It's actually pretty good. And when there are replacement buses ridership completely collapses. The difference is stark, people simply take alternative routes because they know it will be slower. After the route opened it was pretty slow, but after some...
  7. J

    Eglinton East LRT | Metrolinx

    Unless there was an abandoned LRT station at Kennedy, above grade and in the correct orientation. Oh, wait...
  8. J

    GO Transit: Union Station Shed Replacement & Track Upgrades (Zeidler)

    Ah! Honestly, it's for this very reason I feel as though we're making a mistake by not Quad-tracking the OL tunnel between East Harbour and Exhibition and adjusting the turning radii in that section to match mainline standard. Build a new intercity station at City Hall. A western section could...
  9. J

    Finch West Line 6 LRT

    What’s interesting about the Finch West LRT is that the 512 St Clair streetcar actually has the same exact average speed. Which is curious to say the least considering the nature of the corridors differ greatly.
  10. J

    Alto - High Speed Rail (Toronto-Quebec City)

    I actually pondered this as well. Laval has a stop and I think Scarborough should get a stop somewhere near the 401 and Line 4 extension, it's on the way. Allowing those from North York and Scarborough, as well as people from York Region access the line without traveling downtown. After all, VIA...
  11. J

    Ontario Line Extension West of Ontario Place (Speculation)

    You're right. I cited tea leaves as my source. lol But it seems with the recent changes to the UPX this could be a convenient route to take. A branch to the airport on the Kitchener sub and a branch up Jane into North York perhaps. Perhaps a branch every 15 mins to Union. Speculation of course...
  12. J

    Ontario Line Extension West of Ontario Place (Speculation)

    It seems the tea leaves are pointing to the Ontario Line replacing the UPX along the corridor towards the airport.
  13. J

    TTC: Bloor Danforth Line 2 West Extension(s)

    Scarborough's main transit line was so neglected that it literally derailed and was shut down permanently. This argument fails to take into account the reality on the ground. How many routes in Scarborough exceed Hurontario's ridership? Comparing transit in Milton to Scarborough is just one...
  14. J

    Toronto Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited

    The mistake was made when the McGuinty gov't decided to make the UPX focused on business travellers. At the time there was no additional stations planned along the route, and the province continually told residents of the City that the corridor was not for them. There was no direct connections...
  15. J

    Toronto Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited

    I mean, for business travellers it's an extra 10 mins once all is said and done. But what about someone from St Clair and Old Weston? Currently this trip is 45 mins midday to Union. A trip from here is reduced to 15 mins, saving 30 mins. What about Woodbine? Local transit is 1hr 16mins, with...
  16. J

    Toronto Eglinton Line 5 + GO: Caledonia Station | 11.72m | 2s | Metrolinx | McCallum Sather

    I think it’s possible that Metrolinx is waiting until the Hydro Corridor along the route is buried before double tracking this section.
  17. J

    Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)

    I keep hearing there's no space for another platform to service Milton trains at Bloor GO, but it sure looks like there's more than enough room. It would be really useful for Milton trains to have a connection here.
  18. J

    SmartTrack (Proposed)

    The St Clair Transportation Master Plan comes out to ~$215M, not including the station and it's funding is linked to the new station program. It includes an extension of Davenport Rd, Union St, Gunns Rd, and Keele St. It's already been extensively studied, the city really wants to get it over...
  19. J

    Cycling infrastructure (Separated bike lanes)

    Sigh, Are we gonna have to chain ourselves to Bloor (re: Spadina Expwy)? Where is Jane Jacobs when you need her? I know she's passed, but all jokes aside. I don't think many urbanists have the stomach to watch construction workers tear up our complete streets. It's just too violent. Too many...
  20. J

    Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    Ah, I found the IBC that Metrolinx did for St Clair (Barrie Line) / Earlscourt Station. Metrolinx scrubbed it from their servers. Ellesmere (Stouffville Line) and St Clair (Barrie Line) seem to be the only ones from the document that got 'delayed.'...

Back
Top