News   Jul 23, 2024
 355     0 
News   Jul 23, 2024
 431     1 
News   Jul 23, 2024
 1.8K     3 

Search results

  1. P

    Toronto 700 Bay Street | 94.79m | 32s | KingSett Capital | BDP Quadrangle

    There is some action around the West end of the building
  2. P

    PATH Network Expansion (various, various, various)

    It seems there is a tunnel between Queen's Park subway station and government buildings nearby. What is the extent of that connection? Is it accesible to the general public?
  3. P

    PATH Network Expansion (various, various, various)

    The city has updated PATH map. The new version differentiates at-ground and above-ground links from the rest.
  4. P

    Toronto 700 Bay Street | 94.79m | 32s | KingSett Capital | BDP Quadrangle

    There is a smokestack just across the street. I'd assume, at 45s, the building would be taller that the smokestack. That has to be an issue?
  5. P

    Residence College Hotel new Lecture Hall (90 Gerrard St. W, 2s, DSAI)

    Thanks. Some of the machinery is left parked on site as if the next step was to begin soon.
  6. P

    Residence College Hotel new Lecture Hall (90 Gerrard St. W, 2s, DSAI)

    The pit has been filled in with a dirt brought from outside. Can somebody answer - why would they fill in the pit? I assume we are not getting a parking lot here. We've seen this on other sites, too (1BE). I would attach a picture but the feature doesn't seem to work for me.
  7. P

    Residence College Hotel new Lecture Hall (90 Gerrard St. W, 2s, DSAI)

    Quite a busy site although still very slowly moving, in my view. Does somebody know why?
  8. P

    Toronto Ontario Line 3 | ?m | ?s

    For an individual, how rational is looking forward to a project that is at least 10 years away until completion and that will make things so much worse before making them better? For a city/society - sure, why not.
  9. P

    Toronto Women's College Hospital | 70.1m | 10s | P.E.B.

    Yesterday . Can't get comfortable with wasting large sound interesting buildings.
  10. P

    Toronto 383 Sorauren Avenue | 33.83m | 10s | Gairloch | a—A

    I'm pretty sure ud was being sarcastic. http://goo.gl/maps/sWtpA
  11. P

    Toronto Howard Park Residences | 24.99m | 8s | Triumph | RAW Design

    Only a pile of rubble is left. The structures are gone, including foundations.
  12. P

    Toronto Chelsea Green (was 33 Gerrard) | 297.25m | 90s | Great Eagle | a—A

    The scaffolding is coming up along Gerrard street entrance (re-branding related?).
  13. P

    Residence College Hotel new Lecture Hall (90 Gerrard St. W, 2s, DSAI)

    Cellphone picture through a dirty window. I believe they built the mound hoping to avoid bringing over that huge crane.
  14. P

    Residence College Hotel new Lecture Hall (90 Gerrard St. W, 2s, DSAI)

    A lot of the building is still there. 2013.01.08 2013.05.31
  15. P

    Toronto Billy Bishop Toronto City Airport | ?m | ?s | Ports Toronto | Arup

    The progress so far of the pedestrian tunnel to Billy Bishop Airport - G&M http://www.theglobeandmail.com/news/toronto/the-progress-so-far-of-the-pedestrian-tunnel-to-billy-bishop-airport/article12155393/
  16. P

    Toronto Howard Park Residences | 24.99m | 8s | Triumph | RAW Design

    The property now has a fence around it.
  17. P

    Residence College Hotel new Lecture Hall (90 Gerrard St. W, 2s, DSAI)

    Any bets how long it will take until the building is gone, at this rate? I'd say six months?
  18. P

    Residence College Hotel new Lecture Hall (90 Gerrard St. W, 2s, DSAI)

    Slow progress (regress?) here
  19. P

    Residence College Hotel new Lecture Hall (90 Gerrard St. W, 2s, DSAI)

    Today: The Eastern side is almost fully stripped

Back
Top