    SmartTrack (Proposed)

    It’s one thing to pick and choose stations based on cost vs ridership return but if King Liberty got dropped merely because the city couldn’t admit it was going to have to invent a budget line to build roads in midtown, folks in that area might justifiably be ticked about that
  2. dowlingm

    SmartTrack (Proposed)

    I did wonder if some Finch-Kennedy costs (which will benefit car drivers) were assigned to the grade sep. There was reference to the station having an integrated design with the separation, which makes sense, but my recollection is that the only rail Sheppard East LRT project paid for is the...
  3. dowlingm

    Bruce Power: New Nuclear Generation Capacity

    If you are building gigawatts of new capacity but integrated into a trans-border grid, this would seem an unwise position to take if you want to be seen as a reliable partner over multi-decade time horizons...
  4. dowlingm

    VIA Rail

    But Woodstock, Brantford, Ingersoll are solely dependent on VIA, where the above mentioned cities also have GO service. If there is a notion to have medium intercity frequency service which will compete with Metrolinx for passengers, platforms and track slots between Union and Kitchener, I...
  5. dowlingm

    VIA Rail

    Because VIA are a tenant, and can only rely on retaining what their existing agreements allow them have. I haven't read those agreements but given recent history I doubt VIA have needed more than 3 slots/direction/day in recent years.
  6. dowlingm

    General railway discussions

    There is plenty of context out there if you are willing to go and do the reading about high speed rail in NYS, rather than throw out your wild suggestions and require others to fact check it for you.
  7. dowlingm

    VIA Rail

    What do you think the chances are of VIA buying track for 110mph and then have Metrolinx and CN telling them they can have 2-3 slots (between Kitchener and Union) per direction, per day, tops? The thing about the Kitchener-London trackage (other than Doug Ford complicating things with his...
  8. dowlingm

    General railway discussions

    *chuckles in CSX*
  9. dowlingm

    Bruce Power: New Nuclear Generation Capacity

    It's a shame that Nanticoke nuclear didn't start construction when the coal plant was killed - we could have been a lot further ahead now. It is fair to say some of the growth in things like data centers could not be anticipated, and of course there was ideological opposition. Being able to send...
  10. dowlingm

    GO Transit: Construction Projects (Metrolinx, various)

    ah - I see now that the other platform does not have a green/red mixed stripe. That does ring a bell now that I think about it.
  11. dowlingm

    Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    There is certainly an intention. Possibly just a lack of funding, or a decision that other projects are soaking up the capacity of companies which might bid on it https://www.metrolinx.com/en/projects-and-programs/barrie-line-go-expansion/studies/mcnaughton-road-grade-separation
  12. dowlingm

    TTC: Electric and alternative fuel buses

    I was thinking of something more akin to how OPP provides local policing services in places like County of Wellington.
  13. dowlingm

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    It's not just signalling in the underground section, it's also automated operation. So that increases the degree of difficulty substantially.
  14. dowlingm

    Orangeville-Brampton Railway (OBRY)

    Difficult when CP are retaining the last stretch of track into Streetsville - if they abandoned that, it would be an interesting potential cross transfer for Milton folks working in central Brampton, but not really compelling without Milton 2WAD. Expensive to go under the CN *and* the new...
  15. dowlingm

    TTC: Other Items (catch all)

    Steve Munro's report on the work car issue: https://stevemunro.ca/2024/11/26/subway-hydraulic-fluid-spills-investigative-report/
  16. dowlingm

    Danforth Line 2 Scarborough Subway Extension

    "the thing about subways is you are underground and not disrupting traffic like my Uber Eats order" :D
  17. dowlingm

    VIA Rail

    Point taken. That said, given the relationship of energy and velocity, nudging a bit over 80 here and there is a bit different to long stretches of 95-100mph, or more. While the current GO situation is not great, hopefully the deployment of ETCS will provide more protection against that...
  18. dowlingm

    GO Transit: Construction Projects (Metrolinx, various)

    I assume the track (right-most) with no platform at Scarb Junction is an accidental omission?
  19. dowlingm

    TTC: Electric and alternative fuel buses

    do you have a cite for that? I hadn't heard of any municipality outsourcing operations and fleet to MTO/Metrolinx.
  20. dowlingm

    VIA Rail

    I was surprised that cabs were signed off as full length passenger spec in a new build consist. The one thing about having a cab which has no or limited seating is that it does provide more buffer in the event of a collision, particularly when sharing track with freight locomotives with limited...

Back
Top