News   Dec 12, 2025
 443     0 
News   Dec 12, 2025
 1.2K     4 
News   Dec 12, 2025
 566     0 

Search results

  1. 1

    Finch West Line 6 LRT

    It's better to just wait at the concourse and head down to the platform when the train approaches.
  2. 1

    Finch West Line 6 LRT

    The stations and stops of the line are built for SoCal weather. Waiting at Humber College and Finch West (slightly better) is unpleasant in winter.
  3. 1

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Your example of going from Woodbine to Ontario St. will remain a streetcar trip because the distance between Leslieville station and Ontario St. is short (< 2 km). Going to Ossington or even Spadina, however, it will be quicker transerfering onto OL at Leslieville. Also as I recall, the...
  4. 1

    Finch West Line 6 LRT

    The exit information should be on its own section.
  5. 1

    Finch West Line 6 LRT

    I believe most (if not all) GO stations are staffed at least during operating hours.
  6. 1

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    I can't overlook the big misalignment with Finch/Finch West, Sheppard/Sheppard West and York Mills/Wilson on that diagram.
  7. 1

    Finch West Line 6 LRT

    At the bottom:
  8. 1

    Toronto Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited

    I only just noticed these on the UP website:
  9. 1

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    That's the new signage standard for accessible routes. It's more informative and inclusive than the standard accessible symbol.
  10. 1

    Toronto 801 York Mills | 10.67m | 2s | First Capital | Turner Fleischer

    It's tucked away in the back. For this part of Toronto, that's a small win.
  11. 1

    Toronto Bayview Village | 118.5m | 31s | QuadReal | Giannone Petricone

    Second crane is up since last Friday.
  12. 1

    Toronto Bayview Village | 118.5m | 31s | QuadReal | Giannone Petricone

    Eastmost tower, 21-storeys.
  13. 1

    Toronto King-Liberty GO Station | 21.39m | 3s | Metrolinx | WSP

    Almost always walking. The waiting time for the train alone can equal to or exceed the walking time.
  14. 1

    North York City Centre (Yonge & Sheppard)

    Unless there's brand loyalty, there is little reason to visit the Empress Walk location unless you live in the condo towers right above. 15min walk to the south gets you access to 4 better options - three full size (low to high price points), one urban sized. If you really need a Loblaws, the...
  15. 1

    Richmond Hill Yonge Line 1 North Subway Extension | Metrolinx

    Perhaps you will like this. Now I realize they've just missed the perfect opportunity to connect the bus terminal to the 23 Sheppard West concourse.
  16. 1

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Japan takes their time. This line in Tokyo was completed in stages over 30 years. Interesting bit: The first 3km section took seven years to construct, but another nine years before it was opened.
  17. 1

    Toronto Ookwemin Minising | ?m | ?s | Waterfront Toronto

    I guess they only look difficult because they are direct indigeneous words/phrases. Whereas a lot of the indigeneous origniated names we've came to know are "anglicized" spellings.
  18. 1

    Vaughan AlpenFury at Canada's Wonderland | 50m | ?s | Six Flags

    Didn't realise Yukon Striker is already 6 years old. Feels like it just opened not so long ago.
  19. 1

    TTC Ridership Growth Strategy 3

    The numbers are percentages. Judging by the traffic on the 401 (or other expressways), they make sense. Those traffic are not likely to be replaced by bike trips.
  20. 1

    Toronto Ontario Place: West Island / Therme Spa | 45.15m | 9s | Therme Group | Diamond Schmitt

    It depends on what they meant by "across Ontario Place".

Back
Top