News   Jul 12, 2024
 1.4K     0 
News   Jul 12, 2024
 1.1K     1 
News   Jul 12, 2024
 398     0 

Search results

  1. M

    Toronto One Bloor East | 257.24m | 76s | Great Gulf | Hariri Pontarini

    Another day, another crane. I realize an image of the new crane has been posted already, but here's another perspective.
  2. M

    Toronto One Bloor East | 257.24m | 76s | Great Gulf | Hariri Pontarini

    When they further excavated that rectangular area at the bottom of the pit, the tops of those concrete columns were exposed, and they jackhammered them down to the pit floor. This took place a few weeks ago. I believe that most of the columns that were exposed (if not all) were within the area...
  3. M

    Toronto One Bloor East | 257.24m | 76s | Great Gulf | Hariri Pontarini

    Monday morning update - only a picture of the pit this time, no skyline (different camera). Regarding the two excavators in the top right (southwest) corner, the one in the pit is actually dropping rubble directly into the scoop of the other that is reaching down and then loading the dump...
  4. M

    Toronto One Bloor East | 257.24m | 76s | Great Gulf | Hariri Pontarini

    Hello All. Long time lurker, but I happen to have a front row seat on this project (at least until it's over 15 floors or so), so I thought I'd share a pic. Enjoy.

Back
Top