News   Apr 17, 2026
 675     0 
News   Apr 17, 2026
 1.5K     6 
News   Apr 17, 2026
 648     0 

Search results

  1. A

    Alto - High Speed Rail (Toronto-Quebec City)

    Alto isn't interested in doing engineering before alignment choice when Cadence (Atkins) will step in to handle the mitigation. Alto did just hired a Masters in Geotech (Very intelligent according to D. Cook, VP systems). We decided to do their work for them (www.altohsrcitizenresearch.ca). We...
  2. A

    Alto - High Speed Rail (Toronto-Quebec City)

    Building a HSR line is primarily a material handling exersize. around 50Million tons of material will be moved. The clever way to do this is to design the cut/fill balance so that material from high points can be locally used to create embankments in low points. The concrete slab (if used...

Back
Top