News   Apr 17, 2026
 809     0 
News   Apr 17, 2026
 1.8K     6 
News   Apr 17, 2026
 759     0 

Search results

  1. T

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    The concrete section might be used for U-turn or crosswalk as long as a signal light is installed there.
  2. T

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Will it be open before World Cup 2026? I saw lots of works on the south of Dundas need to be done... And the widen roads are not paved and painted, even also the trees...
  3. T

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Thanks for your answer. The new condo is being built at Northeast of Fairview road and Hwy 10, they told me that only 25 steps to the LRT Stop........if it built at CP, 400m distance away taking at least 5 mins walking....
  4. T

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Just Wondering that the "Fairview" stop is not going to be built at Fairview road north?? Metrolinx confirmed that it would be built there.

Back
Top