News   May 17, 2024
 3.1K     5 
News   May 17, 2024
 2.1K     3 
News   May 17, 2024
 11K     10 

Search results

  1. Bibi L

    GO Transit Fleet Equipment and other

    Just to become a GO Train operator you need six years of training. From CityNews: "Seems simple but it's not, becoming a GO train operator takes about six years of training. (Metrolinx): We hire everyone on as a customer service ambassador, the training for that's about six to eight weeks long...
  2. Bibi L

    Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    Thank you. And yes, “bro” is correct.
  3. Bibi L

    Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    May 12 More glass Is that a ramp to an underground parking lot? Alleyway Phase 1
  4. Bibi L

    Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    May 12 What floor count are we at, 25? Some close-ups:
  5. Bibi L

    Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    They have put green scaffolding around the heritage building. It looks like they are only renovating the exterior.
  6. Bibi L

    Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    May 5, 2024 The SkyTower is starting to get close to 100 meters. For reference, the Toronto Star building is 101 meters to the top, and where I am taking the pictures is 108 meters to the top, but 99 meters to the top floor.
  7. Bibi L

    Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    May 5, 2024 From the ground, Yonge and Esplanade. Taken 33 Floors Up. CN Tower is getting blocked more and more… Through the Window. 31st floor terrace. It’s starting to peak through.
  8. Bibi L

    GO Transit Fleet Equipment and other

    The old coaches have 1 condensing unit on each side, so in total 2. The new ones appear to have 2 on each side, 4 in total. Maybe the older cab cars had to share the HVAC system with the rest of the car since there were only 2, while the newer ones can have their own separate A/C because they...
  9. Bibi L

    Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    Process of installing a window: Windows waiting to be installed. Window being lifted. Almost done Installed. Some windows have been re-installed on the 7th floor correctly. Still have to fix some windows on the 8th floor. Current progress of the whole tower.
  10. Bibi L

    Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    April 22, 7th floor windows removed, looks like they are fixing the glass design.
  11. Bibi L

    GO Transit Fleet Equipment and other

    Going east from Union. Around the same time.
  12. Bibi L

    GO Transit Fleet Equipment and other

    GO Leafs GO @T3G With loco #637 (MP40PH)
  13. Bibi L

    Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    April 19, 2025. CIBC Square is looking great, they finished it so quickly!
  14. Bibi L

    Toronto 45 The Esplanade | 128.85m | 39s | Republic | Arcadis

    How will they arrange the parking? 25 The Esplanade has a shared parking lot with 45 The Esplanade, with P1 being public and hotel parking, and P2/P3 being private gated parking for 25 The Esplanade.

Back
Top