The train set referred to in Hitachi Rail's press release, would be a modified TransPennine Express Nova 1, which is a BR Class 802/2. The standard 802/2 is primarily an EMU (25kV AC) with 3x700kW V12 turbo-diesel engines to allow it to operate on lines that aren't electrified. For the trail...