News   Aug 23, 2024
 1.1K     0 
News   Aug 23, 2024
 1.8K     4 
News   Aug 23, 2024
 539     0 

Search results

  1. I

    TTC: Other Items (catch all)

    Queue jump lane is open and operational. Nice to see this little improvement near my home.
  2. I

    Markham Microsoft Data Centre | 27.9m | 3s | Microsoft | WZMH

    There's been pretty active construction going on for at least a few weeks. Excavators, dump trucks coming in and out, etc. Not much to photograph though, and it's a huge site.
  3. I

    Roads: Traffic Signals

    Great, another set of useless too-closely-spaced set of traffic signals.
  4. I

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    From the news release: https://news.ontario.ca/en/release/1004859/ontario-accelerating-construction-on-the-gardiner-expressway-by-at-least-one-year I'm pretty curious to see the details of these modifications.
  5. I

    Toronto Bike Share

    Thanks a lot, sounds like there's still hope for this year!
  6. I

    Toronto Bike Share

    I've been waiting for a station to open up closer to me since moving into the area. Looking at the 4-Year Growth Plan published in September 2022, a few stations nearby are indicated for opening in 2024. Does anyone know how closely Bike Share follows its growth plan? Are stations opened up all...
  7. I

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Wow, this thing is really going to stand out!
  8. I

    Toronto 50 Scollard | 147.62m | 41s | Lanterra | Foster + Partners

    I guess the units will have windows on both sides? That's going to make for a cool living space, although a bit exposed.
  9. I

    Broadview Eastern Flood protection and area

    Which ramp is being removed? I see the plan seems to show the west-to-south loop ramp being reconfigured and normalized, probably allowing for westbound left-turns onto the ramp for those travelling westbound. Is the north-to-west off-ramp the "Eastern Avenue - DVP Ramp" being removed?
  10. I

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Don't get me wrong, I appreciate paying for quality as much as the next person, just had a bit of sticker shock. A Kryptonite lock in the $100-150 range was more so my expectation. As a pretty casual rider who mainly uses BikeShare now I might be a bit out of touch to what daily cyclist...
  11. I

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    $252 though? I imagine that's as expensive as the average rider's bike.
  12. I

    First EV garbage truck in Ontario

    I thought the sounds were a requirement for reversing only. Honestly I get it, but I find the hum that EVs generate somewhat annoying.
  13. I

    Bradford Bypass (MTO, Hwy 400 - Hwy 404)

    https://news.ontario.ca/en/release/1004566/ontario-awards-contract-for-bradford-bypass AECOM Canada Ltd. (AECOM) is being awarded the contract to design 6.5 kilometres of the western section of the Bradford Bypass.
  14. I

    Cycling infrastructure (Separated bike lanes)

    Thanks for all the info, what a nightmare..
  15. I

    Cycling infrastructure (Separated bike lanes)

    I'm curious, what's the backstory with Sanscon?
  16. I

    Toronto 1125 Sheppard Avenue East | 126.12m | 40s | Concord Adex | DIALOG

    Looks like this means goodbye to McDonalds.
  17. I

    iConnect Community (Krpan Group & The Remington Group,?s, ?)

    I guess it is worth noting that the Dundas BRT will hopefully eventually serve this area and connect all the way to the Kipling GO / TTC Transit Hub.
  18. I

    Toronto Eaton Centre (Ongoing Renewal) | ?m | ?s | Cadillac Fairview | Zeidler

    Oh wow, new staircases. Wasn't expecting those. They are much needed.
  19. I

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    You guys are amazing, thanks so much. With the BRT going in I understand that Dundas is going down to one lane per direction, with only right turns from Hurontario onto Dundas permitted.

Back
Top