News   Aug 09, 2024
 823     2 
News   Aug 09, 2024
 680     0 
News   Aug 09, 2024
 2.9K     2 

Search results

  1. T

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Here's another video of the LRV in motion: https://www.linkedin.com/posts/lorenzoorsi_project-rail-railway-activity-6661628051031367680-NxKd
  2. T

    GO Transit: Construction Projects (Metrolinx, various)

    https://twitter.com/ScenesFromACity/status/1254882323306291205
  3. T

    Toronto 1 Yorkville | 183.18m | 58s | Bazis | Rosario Varacalli

    If the building is almost ready to be occupied, when will the heritage facades be uncovered? I'm interested to see the restoration!
  4. T

    Mississauga The Shores of Port Credit | ?m | 8s | Verve

    How come one half is going up way faster than the other half?
  5. T

    Waterfront Transit Reset Phase 1 Study

    Not sure, though there was supposed to be public consultation in the early Spring including a preliminary feasibility assessment of phasing and portal locations.
  6. T

    Toronto Westshore at Long Branch | 18.55m | 5s | Minto Group | BDP Quadrangle

    Absolutely, these back to back, stated townhomes are a great missing middle housing type: dense, low rise and close to transit. I didn't realize the Honda dealership just closed, I remember over 2 years ago being able to see the empty lot behind the Honda dealership from the GO Train.
  7. T

    Toronto Westshore at Long Branch | 18.55m | 5s | Minto Group | BDP Quadrangle

    When will phase 2 begin? I think the site has been vacant for at least 3 years.
  8. T

    Waterfront Transit Reset Phase 1 Study

    Toronto's Transit Expansion Program - Update and Next Steps- April 16, 2019 http://app.toronto.ca/tmmis/viewAgendaItemHistory.do?item=2019.EX4.1&utm_source=All&utm_campaign=Waterfront+East+LRT&utm_medium=email
  9. T

    Waterfront Transit Reset Phase 1 Study

    It looks like one of the recommendations was to examine building the Queen's Quay East section before Union Station.
  10. T

    Toronto Hudson Toronto Hotel | 45.72m | 14s | Niche | a—A

    That is interesting considering City Council directed staff to oppose the application at LPAT, City Council never approved a settlement offer or demolishing the designated heritage buildings.
  11. T

    Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    Does anyone know if part of the Harbour Street Extension is being constructed at the same time as the first phase of One Yonge? Phase one doesn't have frontage on Lake Shore or Yonge.
  12. T

    Toronto 665 Sheppard West | 41.22m | 11s | EL Regency Group | MAR Architect Inc

    Latest submission to the City is for 64 units, up from previous 48 but the design is very similar. Hopefully this will finally get underway shortly!
  13. T

    Beamish-Kipling-Bloor Future Development site

    I think it's the westernmost part of the Housing Now/CreateTO master plan that's in the works.
  14. T

    Toronto Bayview Village Redevelopment | 113.99m | 30s | bcIMC | DIALOG

    Revised settlement offer submitted in January http://app.toronto.ca/DevelopmentApplications/associatedApplicationsList.do?action=init&folderRsn=4218053&isCofASearch=false&isTlabSearch=false
  15. T

    Toronto TCHC Firgrove-Grassways Revitalization | ?m | 25s | TCHC | LGA Architectural

    The proposed building at the southeast of the site is quite a slab.
  16. T

    Toronto 212 King Street West | 250m | 80s | Dream Office | SHoP

    The property is only about 25m wide, I don't know how they could retain the majority of the heritage building and have a proper tower setback from the adjacent building to the west.
  17. T

    Toronto U of T: Schwartz Reisman Innovation Centre (Phase 1) | 64.8m | 13s | U of T | Weiss/Manfredi

    I have seen a few comments about whether the Banting Institute is going to be demolished, so I wanted to point out this paragraph of the zoning approval of phase 1 which states the City determined the Best Institute did not have heritage value but the Banting Institute will be designated. If it...
  18. T

    GO Transit: Construction Projects (Metrolinx, various)

    "There is also this item on the agenda: "1.2 Document Control Update"."

Back
Top