News   Aug 09, 2024
 762     2 
News   Aug 09, 2024
 651     0 
News   Aug 09, 2024
 2.6K     2 

Search results

  1. T

    GO Transit: Construction Projects (Metrolinx, various)

    Site plan approval submitted yesterday to relocate Oriole GO Station to 2760 Old Leslie Street. This is the location of the TTC Leslie Station Parking Lot. The site is located adjacent to the bus terminal entrance of Leslie Subway Station which would greatly improve the TTC/GO connection.
  2. T

    Toronto Queen Central | 106.23m | 34s | Parallax | Arcadis

    Documents are posted. The tower is setback less than 3m from the eastern property line, and only 1.5m from the Queen Street heritage facades. I like that they are only proposing 28 resident parking spaces for 356 units though!
  3. T

    Toronto eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    I'm surprised retail occupancy isn't until 2020, I thought the building would be complete in the Spring of 2019.
  4. T

    Toronto 43 Bellevue | 10.52m | 3s | Sarazoli Holdings | Edward Lee Architect

    It appears this application is for 2 adjacent lots immediately north of the surface parking lot. The parking lot is also undergoing a study/ consultation process to determine its future use, which may include housing.
  5. T

    Toronto Queen Central | 106.23m | 34s | Parallax | Arcadis

    Look at the "view all properties" drop down: it includes the first three of the 3-storey properties to the right. Those ones are actually nice.
  6. T

    Toronto 1140 Yonge Street | 44.95m | 10s | Devron Developments | AUDAX

    By my approximation, the CR portion of the property is about 50 metres deep. If the 45 degree angular plane was measured from the R zone, about 15 storeys would fit beneath it. However I suspect the proposal will be more in the upper mid-rise range.
  7. T

    Toronto Earlscourt Condo | 31.34m | 8s | Format Group | RAW Design

    This should have retail at-grade. The proposal is for live/ work fronting St. Clair.
  8. T

    Toronto 4800 Yonge Street | 168.24m | 49s | Menkes | Arquitectonica

    I'm interested to see if that changes in the settlement. I can't imagine the City would accept the minimal amount of office space initially proposed when the North York Centre Secondary Plan states that the property should be 100% office.
  9. T

    TTC: Flexity Streetcars Testing & Delivery (Bombardier)

    I rode on 4512 around 5:30pm eastbound on the 504B
  10. T

    Toronto Regent Park: Daniels on Parliament | 88.25m | 25s | Daniels | superkül

    That makes sense, but why are they preparing to demolish the building when there is nothing to replace it?
  11. T

    Toronto Regent Park: Daniels on Parliament | 88.25m | 25s | Daniels | superkül

    It's weird that block 1 is isolated from the rest of phase 3. I don't recall seeing any plans for the building that is slated to built at Parliament and Gerrard. Has anyone else seen plans fo that corner?
  12. T

    Markham York Condos | ?m | 15s | Remington Group | BDP Quadrangle

    Source: https://canada.constructconnect.com/dcn/news/projects/2018/11/york-condos-gateway-downtown-markham#.XAka0L4NDbp.twitter
  13. T

    Toronto The Briar | ?m | 3s | Plaza | Richard Wengle

    The reason 7 units can fit on a lot that previously only had 2 is because the councillor approved selling an adjacent park to the developer.
  14. T

    GO Transit Electrification | Metrolinx

    In the slide deck for the full business case it shows Hamilton GO Centre as having two-way all-day service, but if you look at pages 50 and 51 of the full business case report here it appears the station has been dropped.
  15. T

    Toronto 733 Mt Pleasant | 93.25m | 27s | Rockport Group | Wallman Architects

    Really unfortunate this will result in the parking driveway fronting on Mount Pleasant. The two buildings with similar parking driveways on the west side of the street are not good for pedestrians.
  16. T

    Toronto 619 Yonge | 237.99m | 70s | YI Developments | Core Architects

    These properties were included in the Historic Yonge HCD interim demolition ban. I wonder if that will affect the project if it needs to be approved again because of the additional property.
  17. T

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    I will be interested to learn about the progress of the mobility hub, station area redevelopment and coordination with LRT construction.

Back
Top