News   Jul 17, 2024
 614     0 
News   Jul 17, 2024
 1.8K     2 
News   Jul 17, 2024
 653     0 

Search results

  1. K

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    Yes, i would convert it it to a proper boulevard and build a underground "downtown bypass" with maybe a exit an exit/ entrance at Spadina or Bathurst ... and maybe build some beautiful pedestrian bridges over the boulevard connecting Rogers Center / CN tower to the waterfront .... i don't...
  2. K

    Toronto St Lawrence Market North | 25.3m | 5s | City of Toronto | Rogers Stirk Harbour

    Something like at Union station .. but with proper barriers/ bollards
  3. K

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    Has there been any updates on the bollards on Front St? I haven't heard anything since this article came out back in October ... https://www.thestar.com/news/gta/2022/10/07/as-ugly-as-ugly-can-be-why-are-there-still-temporary-barriers-around-union-station-four-years-later.html
  4. K

    Toronto St Lawrence Market North | 25.3m | 5s | City of Toronto | Rogers Stirk Harbour

    Any plans to improve the street scape/ pedestrian crossing along front street between the two markets?
  5. K

    GO Transit: Construction Projects (Metrolinx, various)

    Also found this in this report https://assets.metrolinx.com/image/upload/v1674661007/Images/Metrolinx/13_-_Supplement_B_-_GO_Rail_Station_Access_EN_jbce3i.pdf Interesting to see they are planning a decrease in parking at most Lakeshore W/E stations
  6. K

    GO Transit: Construction Projects (Metrolinx, various)

    Not sure if people have seen this yet, but Metrolinx recently added a new section under Future Transit Planning related to improving access to Go stations (transits, bikes, walking etc.) https://www.metrolinx.com/en/projects-and-programs/go-rail-station-access
  7. K

    GO Transit: Construction Projects (Metrolinx, various)

    This image from Metrolinx's website sees to suggest that as well I am a little confused .. why did they demolish 99 Subury? The above seems to suggest they don't need that plot? Are they building a parking lot?
  8. K

    Toronto Ontario Line 3 | ?m | ?s

    Went through these earlier and just thought on option E and F. Could they not close down simcoe between Richmond and queen for the lay down area? And possibly for the key hole?
  9. K

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    this is where the lack of transparency from ML is scary ... would feel a lot better if they just came out and explained the cause of the delay and the steps taken to fix it
  10. K

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    https://www.blogto.com/city/2023/02/toronto-hints-eglinton-crosstown-lrt-open-summer/
  11. K

    Toronto Ontario Line 3 | ?m | ?s

    https://www.thestar.com/news/gta/2023/02/09/doug-ford-government-interfered-in-metrolinx-tree-removal-communications-emails-show.html From the article: In a series of emails between the province and the transit agency, Ministry of Transportation staff overrode Metrolinx’s recommendation to...
  12. K

    Toronto Ontario Line 3 | ?m | ?s

    Maybe it's something that can be tackled as part of the 250 University development?
  13. K

    Toronto Ontario Line 3 | ?m | ?s

    I honestly think this can still be saved/ improved ... I hope ML and the city can work together and give the Osgoode Plaza option a serious look. I think that is the best proposal that saves the trees and the the heritage sites and also improves the public realm. And if they can improve the...
  14. K

    Toronto Ontario Line 3 | ?m | ?s

    this is a little hyperbolic but it would almost be better to move the satiation further west and let people connect at street level ... 🤦‍♂️
  15. K

    Toronto Ontario Line 3 | ?m | ?s

    I also find it troubling that the Simcoe entrance will only connect to the OL platform and not have any direct connection to line 1
  16. K

    Waterfront Transit Reset Phase 1 Study

    All I know is it can feel like you are running a marathon trying to catch a GO train after being dropped off at TTC Exhibition loop. I really hope they realign the loop/ stops when the new station and OL gets built
  17. K

    Toronto 1900 Yonge Street | ?m | 45s | CreateTO

    https://www.toronto.ca/wp-content/uploads/2023/01/95da-CityPlanning-1900-Yonge-Street-and-Davisville-Yard-Feasibility-Study-January-19-2023.pdf
  18. K

    Toronto The Quay, Tower Three (was Maple Leaf Quay) | 66.44m | 21s | Pacific Reach | BDP Quadrangle

    Does anyone know if they are making changes to the retail level in the existing towers?

Back
Top