News   Jul 12, 2024
 1.6K     0 
News   Jul 12, 2024
 1.2K     1 
News   Jul 12, 2024
 453     0 

Search results

  1. J

    Roads: GTA West Corridor—Highway 413

    You have to imagine that having an untolled 413 north of the 407 would push down the tolls on the 407 as well.
  2. J

    Kitchener Drewlo Downtown Kitchener | ?m | 23s | Drewlo Holdings

    I think construction was put on hold for quite a long stretch during Covid, which somewhat explains the slow progress. Even without that, though, this project seems a lot slower than others in the region.
  3. J

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    Yeah, they had moved fully over to the new lanes on Friday. The right lane still "exits" under the 407 ramp before merging again just before Trafalgar. This is still a significant jump on traffic, because people still seem oblivious that they can travel that way and stop to merge into the...
  4. J

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    I drive this everyday (exiting onto Winston Churchill), so you think I'd have more certainty, but I think the 401EB configuration is as below right now. So there is a mini-collector, but it's a lot shorter than the one going WB that takes you from Winston Churchill almost to Trafalgar. I suspect...
  5. J

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    Right now you can only use this trick westbound, at least to such dramatically great effect. In the eastbound direction, you can use the Winston Churchill exit to bypass some traffic as there is a sort of mini-collector there as well, but you merge back with traffic after Winston Churchill, so...
  6. J

    London Commuter Rail Discussions

    A *very* popular bike trail.
  7. J

    GO Transit: Construction Projects (Metrolinx, various)

    The slide also references a 31 minute improvement in travel times, though, which makes me think the number isn't a mistake. If you check the schedule, express trips are 34 minutes and local are 42 regardless of direction. Perhaps the average out of Union includes all trains departing on the...
  8. J

    GO Transit: Service thread (including extensions)

    I know Metrolinx has been doing weekend work on the Guelph Subdivision (replacing bridge spans at least, and I think there is planned work to upgrade crossings as well), but I haven't read about any work adding passing sidings even though I understand it is a prerequisite for all-day two-way...
  9. J

    GO Transit: Service thread (including extensions)

    I was reviewing the Initial Business Case Update from 2019 that Metrolinx prepared for the Kitchener Line Expansion for 2-way all-day service (pdf) and noticed this little bit regarding when they are mandated to prepare a business case: This definitely seems like something that would normally...
  10. J

    GO Transit: Service thread (including extensions)

    Interesting. I did a bit of digging separately, and Metrolinx's news release states the following: Metrolinx also has a site up now about the extension, but it similarly has no information on schedule yet. I do think it's interesting how they frame the benefits:
  11. J

    VIA Rail

    I think the press release specified that the train would leave London in the morning and return in the evening, but I was thinking that it would be nice if GO did the opposite to complement the existing Via schedule. That said, I don't think the morning schedule on the Guelph Subd allows for...
  12. J

    GO Transit: Service thread (including extensions)

    If in conjunction with Metrolinx, the Guelph Subdivision were improved so that travel times were comparable to the southern mainline, perhaps we could have future express service with Via (London-Kitchener-Toronto) and some type of local service with GO. Schedule-wise, I've seen some times...
  13. J

    GO Transit: Service thread (including extensions)

    It will be interesting to see what the schedule is as that would make it clearer whether Metrolinx is targeting commuters into Toronto, or people traveling on points along the line. My gut is that this is tied some way into the endless promises for improved rail service on the corridor. An...
  14. J

    44th Canadian Federal Election

    How exactly does 338 Canada put together riding-level projections? As far as I know, living in Kitchener Centre, they have only had one riding-level poll early in the election, and the results were quite suspect.
  15. J

    GO Transit Fleet Equipment and other

    Only issue with that schedule is that they would likely want two platforms in Kitchener when they cross, at least for the morning trips.
  16. J

    GO Transit Fleet Equipment and other

    Someone might board a 6am train from Kitchener to London, though.
  17. J

    GO Transit Fleet Equipment and other

    Why deadhead if they could carry passengers? (besides the cynical view that Metrolinx seemingly can't fathom running a service without Toronto at one end)
  18. J

    Roads: GTA West Corridor—Highway 413

    Looking at those photos, it seems that there won't be a direct connection to the collectors from the 407?
  19. J

    GO Transit: Service thread (including extensions)

    Do they not plug in the second train, then? Or do they just have a really long extension cord? Re: cost of GO, I spend about $250/mo on gas now, for commuting and all other driving. I would therefore need to save about $5000/year in maintenance costs/depreciation of my vehicle in order to make...
  20. J

    GO Transit: Service thread (including extensions)

    My work is just off the 401 between Mississauga Rd. and Winston Churchill, and I live in Kitchener. When I started working there, the options for using GO were simply not tenable for me, but I noticed that Rt 30 stops at the Meadowvale Business Park, which makes the route actually plausible to...

Back
Top