News   Jul 12, 2024
 792     0 
News   Jul 12, 2024
 717     0 
News   Jul 12, 2024
 304     0 

Search results

  1. B

    General railway discussions

    YouTube recommended me this interesting documentary. It provides a more realistic/ sobering view of the passenger rail industry within Europe. For all the flack VIA rail gets for running old coaches from the 1950's, it was interesting to see a Belgian entrepreneur resorting to using carriages...
  2. B

    Oakville Gemini Condos (Oakville) | ?m | 10s | Castleridge

    Drove by the site today. The area across the street, between the Organic Garage and Gemini sales building had the shoring machine. I guess this project encompasses both sides of the road?
  3. B

    Brampton Transit/Zum

    Yeah, sure enough, as I was driving home from work today on the 403, I saw one go over the Mavis St. bridge. I instantly thought of the earlier post I made. It felt like I hadn't seen articulated buses in Mississauga for a long time.
  4. B

    Brampton Transit/Zum

    Growing up in Oakville in the 90s, I always knew I was in Mississauga when I saw the "accordion" buses driving around. Shame Miway seems to have gotten rid of them all.
  5. B

    TTC: Other Items (catch all)

    CP24 was interviewing the ATU President, and he said one of the sticking points was routes being contracted out. What does he mean by that? How do you contract out a bus route? Other buses from bordering cities picking up passengers?
  6. B

    Toronto Billy Bishop Toronto City Airport | ?m | ?s | Ports Toronto | Arup

    Well I guess I spoke too soon. My employer asked me to go to Moncton in July, and since Porter doesn't fly to Moncton out of Pearson, it looks like I'm going to be going to Billy Bishop again. Could have chosen Air Canada out of Pearson, but had to make sure I booked the more affordable option...
  7. B

    GO Transit: Construction Projects (Metrolinx, various)

    Yeah. It just dawned on me, there's no way they could be laying down the tracks for the grade separation at this point.
  8. B

    GO Transit: Construction Projects (Metrolinx, various)

    Why are they using wooden ties? I thought Metrolinx made the switch to concrete ties?
  9. B

    Oakville Gemini Condos (Oakville) | ?m | 10s | Castleridge

    There was a shoring machine on the site today.
  10. B

    Oakville Gemini Condos (Oakville) | ?m | 10s | Castleridge

    This is a photo of the property directly next to the work site. I'm guessing this is going to be Phase 2?
  11. B

    VIA Rail

    A little bit of insight from my job at CN. I've spoke to a couple TC's (Transit Controllers) at the Brampton yard and asked them if the GO or VIA trains running between George Town and downtown Brampton ever get in the way of operations. Both said the GO & VIA trains move so fast and run through...
  12. B

    Cycling infrastructure (Separated bike lanes)

    Not a cyclist, so I'm ignorant on the subject. Why don't they just paint the cyclist sections green like they do up in York region? Drivers in the winter time are going to end up running over these things. Plus these dividers are probably going to end up getting hit by the the snow plows.
  13. B

    VIA Rail

    Looks like train 40. Didn't see it on the previous schedule. I'm taking train 40 to Ottawa on June 19th. I'm probably one of the few people that actually wants to ride the older trains. It's my first time riding VIA and I want to ride the older trains before they get phased out. Thankfully it...
  14. B

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    In a perfect world, the TTC would have been given the money to construct a subway along Eglinton.
  15. B

    Oakville Gemini Condos (Oakville) | ?m | 10s | Castleridge

    Drove by today. Excavator was in "the pit" doing some digging.
  16. B

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Precisely. It could have been extended later on. Going forward transit lines should be done in phases. The enormous size of this project is leading to a lot of issues.
  17. B

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Is it possible that MX is suffering from the effects of nepotism? Too many people in upper management, with no construction, rail or engineering experience, but were promised high paying/ low effort jobs for political favours?
  18. B

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Considering the amount of work they're doing on the western extension, that would be a very concerning scenario. This project would go down as one of the biggest waste of tax payer dollars in Canadian history. Can we just "re-do" this line? Rip everything apart and go back to the original plan...
  19. B

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Metrolinx should squash the rumours and provide an update.
  20. B

    Oakville Gemini Condos (Oakville) | ?m | 10s | Castleridge

    Something is finally happening at this site. An excavator was dropped off today. Will grab photos later.

Back
Top