GO Transit: Construction Projects (Metrolinx, various)

A roads project, sorta, for the GO Construction thread.

On the agenda of the next meeting of SCC is the reconstruction of the Birchmount bridge over the LSE.


From the above:

1776693494457.png
 
That 2030 completion date kinda took my breath away, considering that this project places constraints on LSE and Stouffville service plans…. But it really isn’t that far away (at my age, calendar math is not my friend).
The plan to do the east side does suggest that the biggest piece of widening and retaining wall construction will happen early.
No details provided about the bridge design, ie maybe if the bridge is a single span, the underside can be completed early and track minimally constrained. Whereas if multiple pillars have to be formed and poured, impacts on GO will be greater.
Hopefully ML will hold a project information event with the usual renders and details.
Reading this report, it’s apparent how much detail reaches the public domain from the city versus how much ML discloses to its decision process - a very thorough reporting of impacts and mitigation plans. I much prefer the bureaucratic speak to ML’s puffed up version.
Just need a couple renders.

- Paul
 
Last edited:
…. But it really isn’t that far away (at my age, calendar math is not my friend).

Pffft. C'mon now Paul, more quick witted and spry than most 1/2 your age.... you've got a few more decades to go!
 
Just because they're only building two tracks/platforms doesn't necessarily mean they're removing the space for a third track. The purpose of the third track at Aurora was to let some northbound trains terminate there and await their departure time to head back south, without obstructing the mainline, so the planned track configuration was the same as the current configuration at Unionville: side platforms on the double-tracked mainline, plus a third track along the west side of the southbound platform that dead-ends at the end of the platform. Note that this configuration does not require any additional space between the tracks on the mainline - the third track is on the west side of the southbound platform.
View attachment 729340

There are plenty of examples where Metrolinx has future-proofed side platforms to be converted to island platforms, which is fairly easy to do since you just need to not build buildings in the way of the future track. In some of the more recent cases (Bloor, Cooksville, Guildwood, etc) they even installed tactile markings on the unused edge of the platform facing the hypothetical track.

Guildwood station, note that the westbound "side" platform has tactile markings on both sides, in case a fourth track is installed on the north side, converting it to an island platform.
View attachment 729339

Cooksville station, note the tactile markings on the north side of the "side" platform:
View attachment 729344


The third track at Aurora is completely unrelated to the third track further south. The provisions at Rutherford/Maple are for a passing track without a platform for the purpose of letting express trains overtake local trains, which makes no difference to the line capacity. If you don't care about average speed, you could run 15+ local trains per hour on just 2 tracks south of Aurora, which is way more than the Barrie Line would ever need. But to achieve those frequencies you'd need pretty substantial turnback capacity - a basic two-track terminal like the current one at Oshawa GO wouldn't be able to reliably terminate that many trains, so you'd need additional turnback capacity such as the proposed third track in Aurora to reduce the frequency of trains making it to the end of line. This is why some peak-period Lakeshore East trains start/end in Whitby rather than Oshawa - they head straight to/from Whitby yard, to avoid the bottleneck at Oshawa.

The turnback platform doesn't need to be at Aurora specifically, it just needs to be somewhere they want to terminate some of the trains. Mulock or East Gwillimbury seem like good alternative sites where space is less constrained than at Aurora. In fact it doesn't even need to be a platform, it could alternatively be a tailtrack between stations, but that's less optimal for passengers since it eliminates the convenience of having the train already sitting on the platform when passengers show up.

Have you seen any indication that they are planning to install structures that would conflict with the future terminating track?
Thanks for the summary, it was very helpful and informative!

I drove by the west side of Aurora the other day and from what I could see there were no permanent structures obstructing a third track west of the new platform, although I could have missed something.
 
That 2030 completion date kinda took my breath away, considering that this project places constraints on LSE and Stouffville service plans…. But it really isn’t that far away (at my age, calendar math is not my friend).
The plan to do the east side does suggest that the biggest piece of widening and retaining wall construction will happen early.
No details provided about the bridge design, ie maybe if the bridge is a single span, the underside can be completed early and track minimally constrained. Whereas if multiple pillars have to be formed and poured, impacts on GO will be greater.
Hopefully ML will hold a project information event with the usual renders and details.
Reading this report, it’s apparent how much detail reaches the public domain from the city versus how much ML discloses to its decision process - a very thorough reporting of impacts and mitigation plans. I much prefer the bureaucratic speak to ML’s puffed up version.
Just need a couple renders.

- Paul
If the late 2030 completion date comes with three tracks in the LSE corridor being in service then that is a reasonable trade off to me given that aligns with Danforth GO fourth track renovations being completed. The benefits of quad tracking the corridor won’t be realized until USRC, East Harbour, Danforth and Scarborough GO upgrades are complete anyways.

If the northern track remains out of service for four years, thereby reducing that section of the LSE corridor to two tracks, then it’s completely unacceptable.
 
If the late 2030 completion date comes with three tracks in the LSE corridor being in service then that is a reasonable trade off to me given that aligns with Danforth GO fourth track renovations being completed. The benefits of quad tracking the corridor won’t be realized until USRC, East Harbour, Danforth and Scarborough GO upgrades are complete anyways.

If the northern track remains out of service for four years, thereby reducing that section of the LSE corridor to two tracks, then it’s completely unacceptable.
I rode VIA 59 through here and it was slow all the way from Rouge Hill to Union. We barely got up to 100Kmph.
 
Nice to see the track finally being laid, but......If the CPR had been built as slowly as ML gets work done, Van Horne would still be at Palgrave.

I do wonder about the cost of equipment and materials for these jobs. I hope ML is not paying a per diem on all the work equipment that has been parked at Randolph for the past few years.

Rail and ties are not procured on a "just in time" basis, but when they are laid out and then sit unused, somebody's money is sitting idle. A contractor who bought materials usually wants payment asap.

- Paul
 
I'm assuming the lead time for receiving flagging services is due to a shortage of labour?

"Complicating matters further, the lead time required for Metrolinx flagging services is soon to grow from nine weeks to 22 weeks. Staff cautioned that this extended notice period could affect not only whistle cessation projects, but also other major projects within Metrolinx’s right-of-way, including the planned Main Street reconstruction."

Upgrading two level crossing in Stouffville has been approved. Hoover Park started today and is anticipating a June completion. Reeves will begin in June with an August completion. Seeing contractors today at 10:30am suggests City of Stouffville does not intend to align work with planned weekend closures.

The sidewalks on the Hoover Park crossing were being ripped after the final morning southbound trip left (~9am). I was under the impression all work on Metrolinx's ROW needed to be completed overnight or during weekend closures if a CWZ was not erected due to RZGZ policies, but perhaps not all work "counts" on this project.
 
22 weeks lead time? I’m sorry but flagging is far from skilled labour, the vast majority qualify and it’s dead easy. With that considered it pays really well.

I find it very hard to believe if ML claimed there is a shortage of labour. Am I so out of touch to think a well advertised job bulletin could produce a long waitlist of readily available applicants?
 
From the April 14 USRCE CLC Presentation Deck:

[Removed image

Innisfil station is back on the radar?

The schematic shown with projects on each corridor has been the same version shown in the Dec 2025 and Feb 2026 Board Meetings, so Innisfil station has been communicated in this medium for ~6 months. I'm not aware of any particulars on the project itself, but I've been keeping versions of this (and related) charts to see if we can identify any incremental progress.

I chuckle at the "status" of some of these projects being labelled "under construction". For example, a few dozen small trees (5-10cm diameter) have been removed for the second platform and passing track at Mount Joy. This qualifies as "under construction".
 