Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

The climbing system here (black) is primarily for installing the cladding to my understanding. The climbing system that was used for installing the floors (blue) has long since been fully removed...making The One ahead of that game, so to speak.
So what you're saying is if the last row of class goes on Pinnacle 1 before OBW is when we can count sky Tower as a winner edit. I had not seen @jer1961 Post before writing this going to be cool to see the top without the RCS looks like both projects are truly pulling together at the same time
 
^...and as you can see then, it's also starting to get dismantled.

And keep in mind, Pinnacle One never a climbing system for cladding. Just a wing and a prayer that the exposed elements don't blow the workers off while installing the respective cladding here... >.<
 
DSC_4809.jpeg


DSC_4810.jpeg
 

Back
Top