    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    Saw traffic on the new Tremaine overpass yesterday. Not sure when it opened, but vehicles are now flowing!
  2. V

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    Looks like the 401 closure between RR25 and Guelph Line from 9pm on the 12th to 9am on the 13th is to "support the demotion of the existing Tremaine Road bridge". Not sure if that means they are taking the bridge down or just prepping to take it down...
  3. V

    Roads: Ontario/GTA Highways Discussion

    I hope it doesn't take them that long to get the Morrison bypass going. The backup getting onto 6S from EB 401 is getting worse by the day, lots of traffic there. I 'like' how they temporarily solved the problem many years back by just making the exit lane from the 401 longer.
  4. V

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    There has been some paving on the other side of the barriers on the WB side of the 401, past highway 25. Not sure if they are going to have additional lanes past highway 25 any time soon, but maybe. Obviously the bottleneck will remain regardless but may help traffic flow a little in that area...
  5. V

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    We've been moved over to the left in the WB lanes past hwy 25 recently and concrete dividers have been put up on the right. Not sure if that is just for construction vehicle movement or if they are actually grading for expansion to Tremaine at this point. My worry is trucks getting on the...
  6. V

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    Concrete girders have been put up on the new Tremaine Rd overpass. Got a quick shot with my dashcam, not a lot of detial but I thought the silhoutte was pretty.....
  7. V

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    For those that don't travel west too often, full-out paving operations have been underway on the remaining expansion between Hespler and Townline. All new sections have been paved and most old-new sections have been ground down to pave over. High-mast light poles are waiting beside their...
  8. V

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    Out in the far west, Cambridge expansion still chugging away. Ramp on EB to Townline is back open and lanes are realigned to new sections in both directions, while the old inner section is torn up. Hespler bridge work is finishing up, including the road work in that area. Website with updates...
  9. V

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    Can confirm, drove it this morning. Though I swear there was no signage that we were going into the express lanes, maybe I missed it.
  10. V

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    Ok everyone, this could be it. Looks like the 401 overpass at the rail line east of hwy 25 is done. They were finishing up the concrete barrier last week and now the temporary concrete dividers have all been removed. The express lanes from Mississauga Rd to the 'old-new' section are paved and...
  11. V

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    Several digital sign boards now up over the highway, though not operational yet. A couple more to go up and that will be done with. Lots of work at the connection between the old-new and the new-new section connecting the previous phase and the new phase. Paving operations underway between the...
  12. V

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    Looks like things are just beginning to wrap up in the West. Lots of grinding/paving operations this week for the final asphalt layer. The major bottlenecks to construction completion, which are the train bridge at hwy 25, bridge just before credit river and the credit river bridge are starting...
  13. V

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    Collector/express system now open, westbound only, from just after the 407 all the way to James Snow. Have been taking the collectors this week and have been flying down that stretch while the express crawls (afternoon rush). Not sure why they have two lanes closed at Trafalgar EB 401 at 6 in...
  14. V

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    Will the concrete section of this expansion end at the previous phase? It seems it will be only asphalt from there on (West) as the collector lanes have only been paved, no asphalt.
  15. V

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    Some things I thought were interesting to discuss/ask on this broad-reaching topic: - Cambridge Expansion No real activity the past few weeks as all lanes have seemingly been paved and are currently in use. Great traffic flow, for the most part, in this area now. Almost too wide! - No...