News   Dec 05, 2025
 1.2K     5 
News   Dec 05, 2025
 4K     12 
News   Dec 05, 2025
 766     0 

Recent content by Steve Munro

  1. Steve Munro

    Finch West Line 6 LRT

    According to a report on the TTC Board agenda, "It is projected that Revenue Service Demonstration would be completed in October, and that Substantial Completion would be achieved in early November. [...] Once Revenue Service Demonstration is completed, the TTC will perform another cohort of...
  2. Steve Munro

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Just so everyone knows what AM peak service levels were back in January 2020 pre-pandemic: 34 Eglinton East : every 4 minutes (15/h) to Don Mills, every 6 (10/h) to Kennedy Station 54 Lawrence East: every 4'30" (13.3/h) to Leslie 51 Leslie: Every 20' (3/h) to Leslie 56 Leaside: Every 10' (6/h)...
  3. Steve Munro

    TTC: Streetcar Network

    The east-west crossing routes are relatively infrequent, but they have nearside stops and so their interaction with the signals is completely different. What is needed is the "sense" in signal controllers that there is an approaching streetcar *and* space on the farside platform so that...
  4. Steve Munro

    TTC: Streetcar Network

    A few points worth noting here. If there were excessive delays that removing stops at Sussex and Willcocks would solve, you would see a lot of horizontal lines at those locations, but they aren't there. The big problems come with lack of true priority at the major intersections compounded by the...
  5. Steve Munro

    TTC: Other Items (catch all)

    The switches in that part of the yard are manual and cannot be activated remotely. It is possible that with snow packed in the switch, the points were not completely set in the intended direction. Also, these switches can be driven through in the trailing direction without being manually...
  6. Steve Munro

    TTC: Other Items (catch all)

    The train is on a yard track, not the main line. There is no "northbound" or "southbound" here.
  7. Steve Munro

    TTC: Streetcar Network

    I believe that 4617 was the car that tried to go to George Brown's cooking school at King & Frederick.
  8. Steve Munro

    TTC: Streetcar Network

    All streetcars can run in reverse. Any limitations are in operating policies or built into the control systems, not an inherent technical limitation. It's easier with pans because you don't need someone to guide the pole through special work, let alone to run interference with traffic.
  9. Steve Munro

    TTC: Streetcar Network

    I might have this info in my archives, but it's in hard copy. I can't find an electronic version. I will look and get back to you.
  10. Steve Munro

    TTC: Streetcar Network

    There is now a detailed list of planned streetcar and subway work for 2025: https://www.toronto.ca/legdocs/mmis/2025/ttc/bgrd/backgroundfile-252236.pdf
  11. Steve Munro

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    The planning for the new routes is in place, and they have probably designed most of the schedules, subject to tweaks from service changes that may have happened in the interim. (For example a service improvement on a route affected by Line 5 that was implemented after the new, post-line-5...
  12. Steve Munro

    Streetcar Tracks on Adelaide

    The TTC has just announced that Queen cars will begin operating via the Richmond/Adelaide diversion on Sunday, November 10. https://www.ttc.ca/service-advisories/Service-Changes/501-301-Routing-change
  13. Steve Munro

    Streetcar Tracks on Adelaide

    TTCHelps confirmed earlier this morning that "mid November" is the correct date.
  14. Steve Munro

    Streetcar Tracks on Adelaide

    For accuracy, the TTC posted a new notice (there are four at last count) listing the Church/King/Spadina diversion as running to "mid November". The previous date was "November 3". Notice saying Nov 3...
  15. Steve Munro

    TTC: Streetcar Network

    The water main is from York east to Victoria. That's why they are doing the streetcar track west from York to Charlotte now. The eastern part and the York Street connection to Queen will be done under a separate contract in 2023. That one will be a Metrolinx contract, so who knows how badly they...