Forums
New posts
Search forums
What's new
New posts
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Calendar
Log in
Register
What's new
Search
Search
Search titles only
By:
Current visitors
New profile posts
Search profile posts
Menu
Log in
Register
News
Jan 23, 2026
Mass Timber Rises Behind Church Walls at Danforth Baptist Redevelopment
1K
0
News
Jan 23, 2026
The Next Round of Transit in the GTHA: Hybrid Rail
1.8K
2
News
Jan 23, 2026
Revised Plans Submitted for 39-Storey Rental Tower in South Unionville
1.2K
6
Members
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
smallspy's latest activity
S
smallspy
replied to the thread
VIA Rail
.
The VLocity trainsets being built in Australia, which mechanically are almost identical to the various Voyager types operating in...
Yesterday at 9:10 AM
S
smallspy
replied to the thread
Mississauga
Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx
.
The rate of injury per 100,000 passengers is also lower with the Outlooks than it was with the CLRVs. Dan
Yesterday at 9:04 AM
S
smallspy
reacted to
nfitz's post
in the thread
Mississauga
Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx
with
Like
.
In what ways would high floor LRVs make the Waterloo ION run faster? Is there a difference between 70% and 100% low-floor? How much...
Yesterday at 9:01 AM
S
smallspy
replied to the thread
Ottawa Transit Developments
.
Thankfully 30 metre LRVs that are configured with 3 trucks and 5 modules are very readily available from a host of different...
Friday at 3:35 PM
S
smallspy
replied to the thread
Toronto
Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited
.
Except that none of it is government safety bureaucratic overreach. There is no Federal rule that requires the trains be operated this...
Thursday at 5:06 PM
S
smallspy
replied to the thread
VIA Rail
.
On top of all that..... There is nothing installed between the axles on the lead trucks of the loco and cab car - certainly nothing...
Wednesday at 9:18 AM
S
smallspy
replied to the thread
Ontario Northland/Northern Ontario Transportation
.
They have not been certified for use by Transport Canada - they haven't even tested them yet. It is possible that Siemens has developed...
Tuesday at 5:05 PM
S
smallspy
replied to the thread
TTC: Other Items (catch all)
.
It is not clear as yet just what is going to change on these new trains. There may be a lot of carry-over from the TRs for all we know...
Tuesday at 4:57 PM
S
smallspy
replied to the thread
Finch West Line 6 LRT
.
Beyond all that.... The TTC also runs storm cars & trains when the weather is expected to be inclement. They do this done on all...
Jan 19, 2026
S
smallspy
replied to the thread
Alto - High Speed Rail (Toronto-Quebec City)
.
The obsession - if you think it is that - has to do with what is capable. Some members seem to think that using the particular track...
Jan 18, 2026
S
smallspy
replied to the thread
Toronto
Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
Switch heaters, and trackside forces equipped with brooms. The same thing as the full-sized railways. Dan
Jan 18, 2026
S
smallspy
replied to the thread
GO Transit: Construction Projects (Metrolinx, various)
.
The trainshed is not an impediment to electrification of the tracks at Union Station, and never has been. Dan
Jan 18, 2026
S
smallspy
replied to the thread
TTC: Other Items (catch all)
.
The H5s in particular went through a couple of courses of rather intensive work to keep them running reliably. The one that APTA-2048...
Jan 18, 2026
S
smallspy
replied to the thread
VIA Rail
.
The plow was stuck at the time - the operator had exited the vehicle before the train was in sight. Dan
Jan 16, 2026
S
smallspy
replied to the thread
TTC: Other Items (catch all)
.
Why are you assuming that the TTC didn't rebuild any of their equipment? Dan
Jan 16, 2026
Members
Back
Top