Forums
New posts
Search forums
What's new
New posts
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Calendar
Log in
Register
What's new
Search
Search
Search titles only
By:
Current visitors
New profile posts
Search profile posts
Menu
Log in
Register
News
Feb 09, 2026
48-Storey Towers Proposed on Dundas at the Don Valley Parkway
1.2K
4
News
Feb 09, 2026
Eglinton Line 5: Major Game Changer Opens, Awaits Tweaks
1.9K
2
News
Feb 09, 2026
News Roundup for February 9, 2026
531
0
Members
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
robmausser's latest activity
R
robmausser
replied to the thread
Toronto
Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
Coupling is very common in LRT systems. When we want to extend the trains to fit the whole platform, we can use 2 Alstom Citiadis...
Today at 6:40 PM
R
robmausser
replied to the thread
Finch West Line 6 LRT
.
Dont speak too soon. The existing Crosstown vehicles are no longer being made. Once the Eglinton line wants to upgrade to longer trains...
Today at 2:16 PM
R
robmausser
replied to the thread
Toronto
Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
Thats basically irrelevant. The immense cost of subterranean transit is due to the tunnelling, whether its a light metro, LRT or heavy...
Today at 2:12 PM
R
robmausser
replied to the thread
Toronto
Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
The Crosstown was basically a P5 process as I call it. There were too many cooks in the kitchen. Too much involvement from every branch...
Today at 2:11 PM
R
robmausser
replied to the thread
Toronto
Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx
.
Grade separated? Sure. Tunneled? Absolutely not. Unfortunately the lands of the Richview Corridor were sold off to developers, which...
Today at 12:10 PM
R
robmausser
reacted to
urbancog's post
in the thread
Toronto
Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx
with
Like
.
No, but with some excavation there's room to maintain 2 road lanes and put the rail tracks in the centre, with sidewalks between the...
Today at 12:06 PM
R
robmausser
reacted to
crs1026's post
in the thread
Toronto
Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx
with
Like
.
The diiscussion has to include the Fords' sale of land along the Eglinton corridor to developers, thereby narrowing the land available...
Today at 12:06 PM
R
robmausser
reacted to
Voltz's post
in the thread
Toronto
Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx
with
Like
.
No, TBMing under an open corridor is an obcene waste, all because Doug hates streetcars. Even a median line that is separated from...
Today at 12:06 PM
R
robmausser
replied to the thread
Toronto
Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx
.
The reports by Metrolinx to justify the tunnels were hilarious. Hugely overbuilt stations with tons of unnecessary complications and...
Today at 12:05 PM
R
robmausser
reacted to
Voltz's post
in the thread
Toronto
Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx
with
Like
.
There were proposals of elevated stations over intersections, Doug just wanted tunnels.
Today at 12:03 PM
R
robmausser
reacted to
DMICS's post
in the thread
Toronto
Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx
with
Like
.
If only Metrolinx had competent contractors and did the SSE tunnel at Kennedy with some thought, Line 5 could’ve had a continuous...
Today at 12:00 PM
R
robmausser
reacted to
facepalming_brooklynite's post
in the thread
Toronto
Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
with
Like
.
Have you seen what they have done to the staircase at York University station? I don't have a picture now, but half of it is blocked in...
Today at 12:00 PM
R
robmausser
reacted to
Northern Light's post
in the thread
Toronto
Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
with
Like
.
Ummm, I'm as critical of Line 5 as anyone......but your sense of cost needs some tweaks. The lowest tunnel cost anywhere in the world...
Today at 11:59 AM
R
robmausser
reacted to
Westey's post
in the thread
Toronto
Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
with
Like
.
I was after a south side alignment back in those days. Even a separate "tunnel" through the embankment so it wouldn't take away from...
Yesterday at 11:11 PM
R
robmausser
reacted to
ThenWhat's post
in the thread
Toronto
Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
with
Like
.
The main problem with that intersection, as far as Line 5 goes, are the two left turns that cross the LRT track. Both those left turns...
Yesterday at 11:10 PM
Members
Back
Top