Forums
New posts
Search forums
What's new
New posts
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Calendar
Log in
Register
What's new
Search
Search
Search titles only
By:
Current visitors
New profile posts
Search profile posts
Menu
Log in
Register
News
Apr 24, 2026
From Timber to Low-Carbon Concrete, Materials Are Driving Sustainable Design
104
0
News
Apr 24, 2026
One Bloor West’s Wrap Coming Down as Crown Work Advances
467
0
News
Apr 24, 2026
40-Storeys Proposed at Future iON Stop in Cambridge
551
1
Members
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Mrgeosim's latest activity
Mrgeosim
replied to the thread
Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)
.
https://www.ttc.ca/subway-stations/avenue-station - the TTC website says that it's accessible. Every station on the Eglinton line is...
Today at 4:06 PM
Mrgeosim
replied to the thread
Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)
.
That's actually a pretty good idea. Since the bridge is an existing structure, it may allow them to circumvent accessibility standards...
Today at 10:51 AM
Mrgeosim
reacted to
M II A II R II K's post
in the thread
Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)
with
Like
.
Better to pick the right carriage in advance to alight from.
Today at 9:43 AM
Mrgeosim
replied to the thread
Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)
.
It's one of the tradeoffs to having a new track on the eastern side. The only way to solve for this issue is to build an underground...
Today at 9:43 AM
Mrgeosim
reacted to
Sauga89's post
in the thread
Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)
with
Like
.
Here are two new construction updates from Metrolinx. One is for the Kitchener 4th track work, and the other is for the TTC connection...
Apr 14, 2026
Mrgeosim
reacted to
AlbertC's post
in the thread
Toronto
1439 Bloor West | 98.94m | 33s | Neudorfer | Gabriel Bodor
with
Like
.
Community consultation meeting coming up...
Mar 25, 2026
Mrgeosim
replied to the thread
Ontario Line Extension West of Ontario Place (Speculation)
.
Of all the suggested Western alignments, in my opinion this one makes the most sense. It would solve the need for high frequency transit...
Mar 23, 2026
Mrgeosim
reacted to
Tyler Friesen's post
in the thread
Ontario Line Extension West of Ontario Place (Speculation)
with
Like
.
Been thinking about about the best way to extend the Ontario Line westward for a while now, and this is what I've come up with: You'd...
Mar 23, 2026
Mrgeosim
reacted to
unicornsample's post
in the thread
Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)
with
Like
.
First updates shared since December. The lack of progress is frustrating, but tell you what-- I don't envy the poor functionary tasked...
Mar 13, 2026
Mrgeosim
reacted to
JasonParis's post
in the thread
Ontario Line Extension West of Ontario Place (Speculation)
with
Like
.
This is pretty much what I'd like to see. I'd also like to see Line 3 and the UPX eventually using the same technology, if not being...
Mar 10, 2026
Mrgeosim
replied to the thread
Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)
.
I work with construction companies day-in and day-out. They want to get onto a project and finish it promptly because they are, by and...
Feb 24, 2026
Members
Back
Top