News   Apr 24, 2024
 985     1 
News   Apr 24, 2024
 1.6K     1 
News   Apr 24, 2024
 630     0 

Recent content by JayBeeGooner

  1. J

    Mississauga Mississauga Transitway | ?m | ?s | Metrolinx | IBI Group

    Agreed. The primary rationale for the transitway is quicker travel for miway buses and GO buses. It's mean to be a part of larger regional bus network. LRT makes no sense in the section between CCTT and Renforth.
  2. J

    Mississauga Mississauga Transitway | ?m | ?s | Metrolinx | IBI Group

    No. Because the transitway wasn't built to converted to LRT? And it'll be decades before the ridership is high enough to even consider LRT.
  3. J

    Mississauga Mississauga Transitway | ?m | ?s | Metrolinx | IBI Group

    And as constructed.. not built for LRT conversion.
  4. J

    Mississauga Mississauga Transitway | ?m | ?s | Metrolinx | IBI Group

    You said LRT upgrade. The transitway was never designed for upgrade to LRT.
  5. J

    Mississauga Mississauga Transitway | ?m | ?s | Metrolinx | IBI Group

    I talked to the people in charge of the project and they told me, it's not designed for LRT conversion. This project is 25 years in the making.
  6. J

    Mississauga Mississauga Transitway | ?m | ?s | Metrolinx | IBI Group

    I've been using the 109 between sq 1 and Kipling Station off and on since 2012, and from my perspective, ridership has steadily increased, and travel time between sq 1 and Kipling(I don't travel all the way to Islington) has steadily decreased since 2012. The opening of Renforth station will...
  7. J

    Mississauga Mississauga Transitway | ?m | ?s | Metrolinx | IBI Group

    I use the 109 everyday between Islington and Sq1. The 658 bus is 3/4 full daily.The 3:37 bus I use is usually 3/4 full. I've been using the 109 for 5 years and I've seen a steady increase in riders. You save at least 5 minutes when Renforth Gateway opens, a lot of time is lost travelling along...
  8. J

    TTC: Other Items (catch all)

    At least provide printed schedules for low frequency routes.
  9. J

    TTC: Flexity Streetcars Testing & Delivery (Bombardier)

    4430 was offloaded today at Hillcrest.
  10. J

    Presto + bikeshareTO promo = unlimited bike rides all year at 1/2 price (new!)

    I wish there was a BikeTO station near St. Clair and Bathurst. I'd bike everyday to Bathurst Station. It'd be far more reliable than using the dam 7 bus.
  11. J

    Sheppard Line 4 Subway Extension (Proposed)

    He needs Jim K's vote on the SSE. This is politics at it's slimiest.
  12. J

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    I have a 3 yr corporate plan. Costs me $56 with tax. I'll gladly buy my own phone to keep this plan.
  13. J

    Danforth Line 2 Scarborough Subway Extension

    And b y the time the Mark 1111's are out, the DRL might be under construction.
  14. J

    Finch West Line 6 LRT

    The switches on all LRT lines will be double point switches. Heck, at the Leslie barns, I noticed a few switches were double point.

Back
Top