News   Dec 05, 2025
 1.1K     5 
News   Dec 05, 2025
 3.5K     8 
News   Dec 05, 2025
 662     0 

Recent content by giantorangehead

  1. G

    Toronto East Harbour GO and Ontario Line Station | 14.35m | 1s | Metrolinx

    The new bridge being poured is being referred to as the Ontario Line bridge, but if there is supposed to be 4 GO tracks, won't some of the new GO tracks need to go on the new bridge?
  2. G

    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    Fingers crossed. Being able to get downtown without needing to detour down to Commissioners street would save a good chunk of time.
  3. G

    GO Transit: Service thread (including extensions)

    For Lakeshore East, is that 3 additional trains in the morning, and 3 additional trains in the evening?
  4. G

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    This is still the plan right? In order to rebuild the ramps over Lakeshore Blvd east the realignment would have to be scrapped, which would replace the development along the Keating Channel with a rebuilt Gardiner. Not to mention the McCleary District and East Harbour developments along...
  5. G

    GO Transit: Construction Projects (Metrolinx, various)

    Preserving a south access during construction would be huge for me personally.
  6. G

    Cycling infrastructure (Separated bike lanes)

    This nice trail on the north side of Lake Shore Blvd appears like it will cross over the new bridge. Is there any hope that it won't just dead end in a mess of Gardiner-DVP connection relocation construction work for the next 5 years. It would be great to have a trail to get downtown without...
  7. G

    Toronto East Harbour GO and Ontario Line Station | 14.35m | 1s | Metrolinx

    What is the most recent estimate for getting the third track laid and operational? Is that the barrier to increasing service levels on Lakeshore? Presumably not, because they have no issues with every 15 minute service during rush hour and weekends.
  8. G

    Toronto Ontario Line: Exhibition Station | ?m | 2s | Metrolinx | HDR

    What's the purpose of the smaller building to the north connected by the covered bridge?
  9. G

    Roads: Ontario/GTA Highways Discussion

    Does anyone know the estimates for when the 400 widening will be opened? The southernmost section appears to be nearing completion.
  10. G

    Cycling infrastructure (Separated bike lanes)

    Is it safe to say that any bike path that crosses the new Lakeshore bridge to avoid dipping down to Commissioners street is a long long ways away. Moving the Gardiner north being the main obstacle?
  11. G

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    Steel girders being placed for the Lakeshore bridge this weekend. Construction Notice Link
  12. G

    Toronto Bike Share

    If bikeshare makes up 8% to 12% of all trips taken by bike, that's an estimated 300,000 to 450,000 trips by bike in the city. The busiest section of the 401 sees 450,000 cars per day.

Back
Top