You’re right the above ground stations aren’t as complex to build.
The elevated stations in the north end of the line should be the easiest to build but not much work has started on them. Better to focus on starting the longer timeline parts of the line.
The stations on the joint Go-OL line...
Tunnelling is not the lion's share of the overall build of the new line. Station construction is equally as complex and time consuming. For reference, the Eglinton crosstown west extension finished tunnelling in June 2025 (project broke ground in March 2022), but with station construction just...
I'm curious why the roof slab is so much thicker than what's shown in the cross section in the plans.
The plans
Vs actual:
Granted the tuned mass damper is heavy, but wouldn't this thicker slab be shown in the plans?
I mean the current designs of the southern rail level and canopy look extremely value engineered already:
I thought the track layouts for the existing tracks have not been finalised. Though, I do love seeing your designs @WB62 ! And also, the canopy cannot be changed as it has heritage...
A small observation on this announcement and not entirely sure what it means but I do love to speculate.
"We're building more than 800 new homes, including affordable homes..." is listed in the post above.
According to the following infographic from an earlier post we can see that the total...