Harbord: north side curbs going in west of Grace. Surface asphalt east of Grace is all done
Winona: old surface removal starting at Eglinton going south. This is a contra flow renewal and maybe minor extension
Silverthorn: resurfacing done Rockwell to St Clair with contra flows painted to...
I’ve been doing an inventory of bikeway renewals and looks like Havelock (College to Bloor) and Brunswick (Lowther to Bloor) are done.
Road renewals done with sharrows only include MacDonell (Wabash to Wright) and Haldon Ave
The surface of Harbord is done from Bathurst to Grace excluding some top layer gaps mostly on the south side. From Grace to Ossington the old surface is now removed and forms are going in for curbs along the south side track.
Also the re-surfacing of Palmerston from College to Dundas appears...
A few pics from this morning
Dr Emily Stowe Way was repaved with the slip lane from Surrey Pl removed and a left turning bike box painted at the College St end.
Construction on Bedford Rd has started with plans for new bike lanes from Bloor to Lowther
Harbord’s top layer of asphalt is...