I hope that they put the building maintenance unit to the south of that box instead of sticking it on top of it
Edit: Sorry I just read the last page and they are going to stick it on the top. Kinda sucks
These developers are pathetic so I wouldn't get my hopes up. Also it's too late to build the parapet such that the mechanical floors won't be exposed like the parapet they were going to build in the 346 meter plan because they already removed the RCS and the concrete for the parapet has been...
They aren't even done pouring it. They also haven't built the parapet yet but in the end it will stick out 7 meters which is even more than it sticks out now. Just horrible
I don't understand why they don't want to. I don't know how much money they are saving by cheaping out but I would think that it is less than 0.2% of the total cost of this one building but it makes a big difference so it doesn't make sense to me. I could be totally off in that estimate though
Imagine if TD gets to put their logo on that "cube" at the top. It would be a twin to the TD cube on TD Canada Trust Tower and the 3rd TD logo in the area
It did become what it was first meant to be. The original concept was the 308 metre-tall building and the 328 metre concept was a later proposal that was just approved in 2023. We got the original design from I believe 2016.