Forums
New posts
Search forums
What's new
New posts
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Calendar
Log in
Register
What's new
Search
Search
Search titles only
By:
Current visitors
New profile posts
Search profile posts
Menu
Log in
Register
News
Apr 24, 2026
From Timber to Low-Carbon Concrete, Materials Are Driving Sustainable Design
1.5K
0
News
Apr 24, 2026
One Bloor West’s Wrap Coming Down as Crown Work Advances
1.6K
1
News
Apr 24, 2026
40-Storeys Proposed at Future iON Stop in Cambridge
3.2K
7
Members
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
cplchanb's latest activity
cplchanb
replied to the thread
Toronto
Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
everyone except for the bean counter politicians believe it to be crucial. they must have gotten their education from the beancounters...
Feb 9, 2026
cplchanb
replied to the thread
GO Transit Electrification | Metrolinx
.
well.. thats why they elected to water down the project and go with electric locos instead of EMUs as originally promised. the whole...
Feb 9, 2026
cplchanb
replied to the thread
Toronto
Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
Lets revisit that after the hype has died down. Don't forget many of today's riders are foamers
Feb 8, 2026
cplchanb
replied to the thread
Toronto
Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
The screens on the mythical unopened platforms on the stouffville line have entered the chat....
Feb 8, 2026
cplchanb
replied to the thread
GO Transit Electrification | Metrolinx
.
Why does everyone have such a hard on with bi levels? If they have the correct amount of service levels you dont need them. Look at...
Feb 8, 2026
cplchanb
replied to the thread
Toronto
Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
Not necessarily. Its more like politicians need to stop pandering to the car crowd and grow a spine to get signalling right. How can the...
Feb 8, 2026
cplchanb
replied to the thread
GO Transit Fleet Equipment and other
.
is this a pure repaint job or did they also reengine to Tier 4? now when will the rest of the go locos let alone the coaches get brought...
Feb 8, 2026
cplchanb
reacted to
SaugeenJunction's post
in the thread
GO Transit Fleet Equipment and other
with
Like
.
From Discord. F59 repainted to new GO livery. Existing unit, not one of the trains from Metrolink (California). (Edit - swapped out the...
Feb 8, 2026
cplchanb
replied to the thread
Toronto
Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
so dougie confirmed there wont be any inquiry on the debacle....
Feb 6, 2026
cplchanb
reacted to
ProjectEnd's post
in the thread
GO Transit: Construction Projects (Metrolinx, various)
with
Angry
.
The lack of progress and the seeming complete disinterest in this project on Metrolinx’ behalf is *baffling*:
Feb 5, 2026
cplchanb
replied to the thread
Toronto
Ontario Line 3 | Metrolinx
.
honestly it probably is from some sort of cctv on site.
Feb 5, 2026
cplchanb
reacted to
reinventingthewheel's post
in the thread
Mississauga
Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx
with
Sad
.
I’ve always thought the entire MCC loop should be elevated, over the median of Confed+Burnamthorpe and the shoulder of...
Feb 5, 2026
cplchanb
replied to the thread
GO Transit: Service thread (including extensions)
.
I just cant fathom how an issue with a single set of switches has pretty much crippled the ENTIRE NETWORK for the better part of the...
Feb 4, 2026
cplchanb
replied to the thread
VIA Rail
.
so were back to where we were before with locos and wyes... which totally defeats the purpose of the venture sets. is this just a winter...
Feb 4, 2026
cplchanb
replied to the thread
Toronto
Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
its also confirmed that until at least March the trains will run at 60km/h in the tunnels.
Feb 3, 2026
Members
Back
Top