News   Apr 26, 2024
 437     1 
News   Apr 26, 2024
 200     0 
News   Apr 26, 2024
 665     0 

Recent content by brianyyz

  1. brianyyz

    Toronto Sugar Wharf Condominiums (Phase 1) | 231m | 70s | Menkes | a—A

    Sugar Wharf with sugar boat
  2. brianyyz

    Toronto Centricity Condos | 170.7m | 53s | Graywood | Turner Fleischer

    Fenced off. Store is being emptied and the pumps being removed
  3. brianyyz

    Toronto 252 Church | 166.1m | 52s | CentreCourt | Arcadis

    No need to take down the signs when the building is going as well
  4. brianyyz

    Toronto Eighty One Wellesley | 97.53m | 28s | Aragon Properties | Core Architects

    Really a tale of two buildings here. I walk by it every day up and down Church and rather enjoy its slim and glass filled N/S axis. A friend walks daily across on Wellesley and finds the heavy wall of concrete oppressive over the neighbourhood. A good mural would help. .
  5. brianyyz

    Toronto 88 Queen | 167.35m | 52s | St Thomas Dev | Hariri Pontarini

    from Saturday. Crane replacement.
  6. brianyyz

    Toronto Elm – Ledbury | 94.18m | 28s | Fitzrovia | Hariri Pontarini

    Waiting for the corner windows with baited breath.
  7. brianyyz

    Toronto St Michael's Hospital Emergency Department Redevelopment | 29.76m | 6s | Unity Health Toronto | NORR

    Interior demolition continues. I see bits of it from my apartment, such as removal of the SMH non-medical waste facility.
  8. brianyyz

    Toronto 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

    Walked by with a friend who studied architecture but has moved on in life. he was surprised when I told them the low rise building was part of the same development. best way to cheap out a building—make the cheap parts look like a different complex altogether!
  9. brianyyz

    Toronto 252 Church | 166.1m | 52s | CentreCourt | Arcadis

    Pizza Pizza is closed as of yesterday
  10. brianyyz

    Toronto 252 Church | 166.1m | 52s | CentreCourt | Arcadis

    Today there were 4 dump trucks of fill to flatten out the lot from where they dug out the small building. I wonder how long the PizzaPizza will stay alive. I know they have been directing orders to this one from their Village location up the street which is closed for renovations.
  11. brianyyz

    Toronto 252 Church | 166.1m | 52s | CentreCourt | Arcadis

    Monday afternoon….
  12. brianyyz

    Toronto 252 Church | 166.1m | 52s | CentreCourt | Arcadis

    And continued today.
  13. brianyyz

    398 Church St

    Not sure what this means in the big picture, but there was a soil sample rig in the parking lot in front of Kinton.
  14. brianyyz

    Toronto 252 Church | 166.1m | 52s | CentreCourt | Arcadis

    Parking lot closed today.

Back
Top