News   Mar 20, 2026
 1.6K     2 
News   Mar 20, 2026
 2.4K     6 
News   Mar 20, 2026
 619     0 

Recent content by Bojaxs

  1. B

    GO Transit Fleet Equipment and other

    CN still runs frieght trains up to King City on the Barrie line to serve a lumber mill. They also still serve customers on the Metrolinx owned portion of LSW. So it's not like you could setup the overhead electrical infrastructure for these lines, even though they're owned by Metrolinx. I could...
  2. B

    GO Transit Electrification | Metrolinx

    You're probably right. I'm guessing Metrolinx has no desire to go through the trouble of installing and miantaining all the overhead infrastructure that would come with electric trains. The plan is probably to extend the lifespan of the diesel locomotives and hope that battery powered trains...
  3. B

    GO Transit: Construction Projects (Metrolinx, various)

    Consultants & VP salaries
  4. B

    GO Transit Electrification | Metrolinx

    That was pretty much the point I was making. It doesn't mean anything when government agency claims they're going to do something in 10 years when, at a minimum, there will be two elections cycles that could result in a new government being elected and the 10 year plan/ vision being completely...
  5. B

    GO Transit Electrification | Metrolinx

    The thing to remember about these far off deadlines is that Metrolinx is a government agency. Everything can change if a new Premier/ political party wins the next election. Metrolinx's 15 year vision could completely change.
  6. B

    Ontario Northland/Northern Ontario Transportation

    I would imagine CN would have a vested interested in grade separating the diamond. They were quick to remove the rail diamond west of Brampton GO after the OBR was shut down because apparently rail diamonds cause extra wear & tear on the wheels.
  7. B

    Ontario Northland/Northern Ontario Transportation

    With the Province's recent purchase of track from CN, I hope the two parties have also had discussions about grade separating the Doncaster diamond. Similar to the Davenport diamond.
  8. B

    GO Transit Electrification | Metrolinx

    You took the bait!? It was clear as day that electrification was never going to happen as soon as some folks believed it would. Metrolinx put out a gaslighting social media post that featured a 2 second clip if an individual drawing up a rendering of an electric GO locomotive and some folks...
  9. B

    Roads: Ontario/GTA Highways Discussion

    I was thinking more along the lines of running a parallel running Transitway. With the 403 in Mississauga, you could scrap the HOV lanes, widen the road to eight general purpose lanes, and have the Mississauga Transitway running parallel to the highway. Not a fan of the bus shoulder lanes...
  10. B

    Roads: Ontario/GTA Highways Discussion

    Agreed. I think money would be better spent on building bus lanes rather than HOV lanes.
  11. B

    GO Transit Fleet Equipment and other

    I think what threw me off was the word "talent". I was thinking they were referring to actual DB staff. If by "talent" we're talking about mechanics, then yes, that makes more sense and is definitely an issue.
  12. B

    GO Transit Fleet Equipment and other

    It's pretty outrageous when you consider that the locomotives GO uses aren't even that old within the train world. Wikipedia claims that the MP40's came into service between 2008-2011, and the last of the MP54's went into service in 2018. How is it that VIA rail can keep their locomotives...
  13. B

    GO Transit Fleet Equipment and other

    Really seems like Metrolinx dropped the ball when it came to maintaining equipment during Covid, and now it's catching up to them. Whatever money they thought they were saving on maintenance during covid, they're paying for now. Pay now or pay later.
  14. B

    GO Transit Fleet Equipment and other

    https://www.baytoday.ca/local-news/ford-government-hid-decision-to-lower-canadian-content-requirement-for-new-trains-emails-11947822?utm_source=flipboard&utm_content=other
  15. B

    GO Transit Fleet Equipment and other

    I fail to see how cancellation of the DB contract really had anything to do with this. Other than perhaps wasted time, effort & money on the futile endeavour. Metrolinx would still find themselves in this predicament even if they went ahead with DB. The author points out the lost of DB's...

Back
Top