News   Jan 30, 2026
 4.2K     9 
News   Jan 30, 2026
 5.8K     1 
News   Jan 30, 2026
 590     0 

Recent content by Aplus23

  1. A

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Did they pour concrete, is that's what's under the silver tarp? The O-line girders are already there right?
  2. A

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    So is this OCS different than the ones that are giving Finch West & Street cars trouble
  3. A

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    So where exactly will the station be located ?
  4. A

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    well that answers that, thanks
  5. A

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    so what exactly is going on here ? They are currently building the bridgedeck? is that the correct word? Then I'm guessing the abutments are already made and so the bridge will rest on those. Then they remove the temporary structure?
  6. A

    Finch West Line 6 LRT

    well I recently got a new job in the Jane & Finch area & see the lrt being used daily. Looks good to me while driving neway, the stops are much better than the crosstown surface section. Hopefully the line gets better over time with TSP
  7. A

    Sheppard Line 4 Subway Extension (Proposed)

    is that just slow bureaucracy, I mean they know the path, the station stops, they're just extending a line, not building something new
  8. A

    Eglinton East LRT | Metrolinx

    this is what I'd vote for. Scarborough would greatly benefit from this.
  9. A

    Finch West Line 6 LRT

    This is the city's first new transit line and not an extension in like forever no? why don't yall give them some grace? We are asking for trams to interact with traffic (at intersections) in Toronto, this is different from Europe and their policies and their view on transit You guys say in...
  10. A

    Toronto BMO Field Renovations | ?m | ?s | MLSE | Gensler

    can someone point me in the direction of the final renders
  11. A

    Finch West Line 6 LRT

    well TransitThinker posted his video and at the end he reminded everyone who watches that a BRT wouldn't work - (too much busses needed) light Metro - not enough riders Subway - too much money definitely not enough enough riders TSP needs to be implemented, and left turn cars need to go 2nd
  12. A

    Toronto Bloor–Danforth Line 2 Scarborough Subway Extension | ?m | ?s | Metrolinx

    So 2 trains side by side are supposed to fit in that tunnel?
  13. A

    Toronto Ontario Line: Minton Portal + Upper Don Crossings | Metrolinx

    so in 6 months all the piers will be completed?
  14. A

    Toronto Ontario Line: Moss Park Station | 8m | 1s | Metrolinx | HDR

    what's going to happen to the rest of the grounds once the station is built? What's gonna be there ?

Back
Top