This issue could be solved by putting down boarding markers on the platform like at some of the subway stations. Since the line is automated through the underground portion the trains will always stop at the same place. It may be a bit more dicey on the surface portion due to the weather ruining the decals but I think operators do a good enough job stopping the in the proper positions.

Every station already has this:

20260209_110614.jpeg
 
I'm surprised they didn't put some kind of barrier or walls like on Line 4, where the trains don't stop - I don't think there's any plan for 3-car trains in the forseeable future. Especially when they've bothered to stick barriers on the platform between the cars (!).
 
Every station already has this:

View attachment 714301
I'm talking about these markers. If you want people boarding in a specific area then show them where to board. These are already being rolled out onto Line 1, so there omission on Line 5 which is automated underground makes no sense.

Bloor-Yonge_Line_1_Platform,_October_10_2025.jpg
 
Pros;
- Underground is great! Transfers between Lines 1 & 5 make Toronto feel like an actual transit city and remind me of switching between Underground lines in London.

Have you never seen or used some of the other underground subway transfers in Toronto that have existed for decades?

When we have transfer points where 4-5 lines connect we can start with the London Underground comparisons.
 
I'm talking about these markers. If you want people boarding in a specific area then show them where to board. These are already being rolled out onto Line 1, so there omission on Line 5 which is automated underground makes no sense.

View attachment 714303
Or just to promote common courtesy while using public transit. Nothing grinds my gears more.

Getting off at Yonge & Eglinton earlier today, some goof just standing right in front of the door waiting to get on, giving me that "Gen Z stare". As soon as the doors opened I made sure to drive my shoulder into him and bump him out of the way. How hard is it to stand to the side and let people off before getting on?

One thing that I was happy to see was most people standing to the right of the escalators. I saw this heavily encouraged in both Montreal & London. I wish Metrolinx and the TTC would promote this as well.
 
Last edited:
When we have transfer points where 4-5 lines connect we can start with the London Underground comparisons.
It wasn't meant to be a direct comparison. I was just saying how switching between lines was reminiscent of my time in London. All I'm saying. Not in any way suggesting Toronto is on par with London. I get what you're saying.
 
People are saying we can solve capacity by adding a third car to the trains, but Bombardier doesn't even manufacture these trains anymore, so how will we get those third cars? Are they in storage at Mt. Dennis?
I don't know how much peak service demands, but the news was reporting that there were 24 trains on the line yesterday, which would mean 48 cars in use. They own 76 cars, so there is room to scale up.

I don't know why people keep mentioning the fact that these trains are not being manufactured anymore. Is there actual basis for this concern? Most rail vehicles ordered all over the western world are bespoke, surely if they threw enough money at them then Alstom would make more, hence why they made 60 more cars for the TTC's downtown network. A Flexity in Toronto is only supercifically similar to a Flexity in Vienna.
 
It is. Many of the underground stations have one entrance without any escalator or elevator, which is honestly a huge accessibility issue given the depth and amount of stairs.

The most egregious of them is Fairbank, which has one such exit where one would board the southbound Dufferin bus. It is far far superior to take the escalators up and cross the intersection twice rather than go up the flights of stairs. The sufferin' on Dufferin shall continue.
Nope the worst one is definitely Avenue which warns you at the secondary exit that the staircase is the equivalent of a 9 storey building (150 steps to be exact), and tells you to use the main entrance if you have mobility issues. Avenue is the deepest on the whole line and even the escalators, you have to take like 5 to street level. In fact it has dethroned Highway 407 as the deepest on the whole TTC network.
 
Last edited:
I don't know why people keep mentioning the fact that these trains are not being manufactured anymore. Is there actual basis for this concern? Most rail vehicles ordered all over the western world are bespoke, surely if they threw enough money at them then Alstom would make more, hence why they made 60 more cars for the TTC's downtown network. A Flexity in Toronto is only supercifically similar to a Flexity in Vienna.
I mean, I'll agree with you on this. Simply because people keep saying that Metrolinx can't order any more MPI locomotives because Wabtec shutdown their Motive Power division, and closed the Boise, Idaho plant. But I'm sure if Metrolinx threw enough money at Wabtec, they would gladly dig up the blue prints and manufacture them in their plant in Texas.
 
I don't know how much peak service demands, but the news was reporting that there were 24 trains on the line yesterday, which would mean 48 cars in use. They own 76 cars, so there is room to scale up.
I believe they reported that when it opens for full service there'd be 28 trains - so 56 cars in use. A 26% spare ratio.

I guess they could ultimately boost to 30 or 31 trains. So there's not much scaling possible beyond the current full day one opening plan.
 