YongeBloor
Active Member
Remove crane from this thread, there are under the Minton portal thread I beleive. @Paclo @interchange42
Removed! We are renaming the Minton Portal + Don Valley Crossing Bridge thread to Minton Portal + Upper Don Valley Crossings, so yes, we will count all of those associated cranes in that thread.Remove crane from this thread, there are under the Minton portal thread I beleive. @Paclo @interchange42
I still maintain a possible reason the OSC was closed is because they needed the access roads and parking lots for OL construction. Do I have proof? No. Are the roads and lots being so used? 100%Maybe it’s because highlighting that area would draw attention to the work that appears to have been done in front of the Science Centre. I doubt that’s something they’re eager to spotlight, given whatever ends up happening with the property.
Would be a way less politically controversial reason to close it. If that was the objective, it was certainly quite a roundabout path to get there.I still maintain a possible reason the OSC was closed is because they needed the access roads and parking lots for OL construction. Do I have proof? No. Are the roads and lots being so used? 100%
Thinking out loud about the future of the Science Centre building: I wonder how the Université de l'Ontario français (UOF) is performing at its Queens Quay East campus. Could the Science Centre potentially become its future home? There might even be an opportunity to pair it with Collège Boréal — though that seems less likely given the college’s new Distillery District location has only just opened.Is this new? It wasn't included in the media pack released to the reporters today.
View attachment 716206
from here - https://www.metrolinx.com/en/projec...ne/what-were-building/flemingdon-park-station