Looks like the Bowie Avenue Tunnel is confirmed!
Pack it up everyone, Barrie line double tracking is DOA after GO Expansion descoping.
View attachment 693176
Don’t be dramatic! We’ve known this for a while about Caledonia GO. Look at the Barrie corridor, double tracking work has made it to Caledonia GO with grading complete.Pack it up everyone, Barrie line double tracking is DOA after GO Expansion descoping.
View attachment 693176
The full electrification of Lakeshore West to East from Burlington to Oshawa through Union is scheduled to be done by 2038, which is more like 2040 in non-Metrolinx time. I wouldn't hold my breath for Barrie double tracking. A GO station takes 3-5 years to complete. That means Metrolinx is expecting double tracking to not be completed until at least 2030. Considering GO Expansion got descoped, and Barrie moved to Phase 2, there might not be double tracking in Caledonia for another 10-15 years.Don’t be dramatic! We’ve known this for a while about Caledonia GO. Look at the Barrie corridor, double tracking work has made it to Caledonia GO with grading complete.
That’s great, and probably one of the more complex parts of the station.Metrolinx says the Bowie Avenue pedestrian tunnel is now scheduled for installation on the weekend from Nov. 28 to Dec. 1.
View attachment 694892
Look at these design for the station, it doesn't look complicated it's just a platform, a canopy and a 1 storey elevator. this shouldn't take more than a year to build right???Newly updated rendering for this LRT Station. Taken from the architectural plan via SPA.
View attachment 502823
View attachment 502824