pawlyshyn
New Member
Hallelujah!I was out cycling on the martin Goodman today and can report...
View attachment 688847
This is the very bumpy section and my ass is going to be VERY happy once it's done!
Hallelujah!I was out cycling on the martin Goodman today and can report...
View attachment 688847
This is the very bumpy section and my ass is going to be VERY happy once it's done!
Maybe they could start by fixing Unwin. Personally, I’d love to see a smooth, fast loop around Commissioners, Leslie, Unwin, and Cherry, all right hand turns.I was out cycling on the martin Goodman today and can report...
View attachment 688847
This is the very bumpy section and my ass is going to be VERY happy once it's done!
Meanwhile, on Shuter Street, there are these wishy-washy separators that are supposed to allow for garbage trucks and such to go over them. Problem is, these flaps(?)
are rusting and busting all along the cycle lanes. Some are leaning, while others are fully busted and just laying flat now or broken off completely.
I wish they would just commit to something permanent and make it universal. There are too many streets with too many different "types" of bike lane implementations. It comes off very indecisive and reminds of the garbage cans across the city. What version are we on now? 5? 6?.![]()
Parkour PARKOUR!Dundas Bridge over the Don River...
View attachment 688800
View attachment 688801
View attachment 688804
View attachment 688803
Toronto's Chief Planner, Jason Thorne posted on Bsky recently with a number of updates on downtown cycling infra.
The first we've covered here extensively, but I'll share his photo just the same, Habord:
View attachment 688823
He also covered improvements to the Yonge/Queen's Quay intersection: (protected waiting area, bike box etc.)
View attachment 688824
And work on Wellesley: ( new raised cycle track/platforms at bus stops)
View attachment 688825
Checkout Jason's stuff on Bsky here:
![]()
Jason Thorne (@jasonthorne.bsky.social)
Canadian Urbanist and Chief Planner for the City of Toronto 🇨🇦bsky.app
The developer is normally expected to replace what was there OR make it better. I assume they were charged for the raised track reinstatement (and if there had not been a raised track might have had to pay to put one in.That Wellesley raised cycle track and bus platform existed before, back in 2021, before they were destroyed to accomodate the two-way car traffic as the road was narrowed for condo construction across the street. I hope the developer paid to have it reinstated.
View attachment 688983
Why the heck are we using non-galvanized or other ferrous steel for this work?Meanwhile, on Shuter Street, there are these wishy-washy separators that are supposed to allow for garbage trucks and such to go over them. Problem is, these flaps(?) are rusting and busting all along the cycle lanes. Some are leaning, while others are fully busted and just laying flat now or broken off completely.
I wish they would just commit to something permanent and make it universal. There are too many streets with too many different "types" of bike lane implementations. It comes off very indecisive and reminds of the garbage cans across the city. What version are we on now? 5? 6?.
View attachment 688833
View attachment 688832
Curb mounted Flexi-posts.
That's normal, they are refreshed from time to time.
They are committed to something permanent, but that goes in during major resurfacing or reconstruction of the road, every 20-60 years.
This is the temporary, or interim choice. Pouring a permanent curb or raising the cycling track means moving all the catch basins (drains); its much more involved and expensive.
You would either get a lot less cycle tracks or you would have to find another 40-80M per year.
There is another interim solution, which is the mini jersey barriers, but those are also more expensive and require a bit more room.
I get that its not ideal, but at best, the ideal is a 30 year project. So this is what's on offer, unless, you'd prefer less but better, or have the heft to find the additional money required.
Black Creek Drive is intended to basically be a freeway in how it operates minus the interchanges so it's not a surprise, nor do I think permitting pedestrians on it is really necessary.Meanwhile, the "sound of crickets" on nearby Black Creek Drive (which cuts through Tretheway Drive) between Eglinton Avenue West and Jane Street. Currently, pedestrians and cyclists, are "forbodden" along Black Creek itself for "safety" purposes. View attachment 689015
My hope is that Regent Park's final phases get it right on Gerrard between River and Parliament. It's a busy bike corridor where cars pass inches away from cyclists as both try to navigate past streetcars. However there’s no sign that the south curb is being cut back during the construction at the corner of Gerrard and Parliament.The strange thing is that this particular point I photographed is right where the Regent Park Phase 1-3 Redevelopment happened. I remember the workers redoing all these sidewalks from scratch. I really wish they would have just implemented a raised bike lane at that time. More efficient and it would be done and over with (for 20 years or so).