Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

A417D6E4-19F4-476E-812C-4615D0500E84.jpeg


1020A98C-C03C-4653-9094-F3B730238A07.jpeg
 
Even the protection panels used here are sleek looking and are definitely a huge upgrade from the typical “garbage” bags used in other sites😊
I thought those have a more advanced purpose than the bags though...
 
Photos taken Sunday (April 30). Came down to the site during the heavy rain on Sunday afternoon as they were raising the fifth platform section to hang from the truss on the east side. I was told there will be nine sections to a side, with additional corner sections so the exterior will be completely covered, save for the south side with the crane. I think there are some issues now with raising the truss on the west side, and there may be delays there.
The sequence shows the section being hoisted up, hung by a yellow frame, called the "banana," with the banana slid into the truss. Those specks are rain droplets. Then, the section is rolled into position along the banana, secured and the attachments to the banana are released and it is pulled away. The final shot shows the five new sections on the east side now in place, all added this weekend, with two more sections to be added on each side, and a corner section to connect to the north face.

UTIMG_3488.jpg
UTIMG_3506.jpg
UTIMG_3529.jpg
UTIMG_3539.jpg
UTIMG_3547.jpg
UTIMG_3578.jpg
UTIMG_3601.jpg
UTIMG_3718.jpg
UTIMG_3851.jpg
UTIMG_3985.jpg
UTIMG_4076.jpg
UTIMG_4298.jpg
UTIMG_4317.jpg
UTIMG_4345.jpg
 
Last edited:

Back
Top