News   Dec 11, 2025
 84     0 
News   Dec 10, 2025
 2.1K     1 
News   Dec 10, 2025
 1K     5 

Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

All the wasted space makes me regret we didn't go with 7 segment trains . . . or just fully grade separate it and do a metro

If this line reaches overcapacity (which is not projected for a long time), the gov can grade separate it eventually. That is what LA is now doing with their old LRTs. Not sure how the political climate will be then. But hopefully, attitudes will warm to elevated rail after other ones open in Toronto. (Ontario Line)
 
Ottawa is learning that the convenience of being able to do that, does not actually exist. They had that plan too, but they have left them connected.
Ottawa doesn't always try very hard. They bought hybrid buses years ago and decided it was too much work to actually drive them on urban stop and start routes, so they drove them on express routes and decided they didn't save money. I am not sure they aren't doing the same thing with running shorter trains at night.
 
Nov 06
This is the first of 3 posting for the line as the 3 posting are for 3 different areas that are tag different and in their own album. There is a lot more up on site for the 2 main areas at this time and the 3rd will be up by tonight.

Kennedy Intersection with traffic lanes being move back to their original location along with new sidewalk and driveways
50582649812_39315a2fba_b.jpg

50581793278_f692b35e42_b.jpg

50582527176_fd9404f764_b.jpg

50581793563_1db6a3fb96_b.jpg


Kennedy Rd to Victoria Park
50581789843_ee9d12e172_b.jpg

50581789963_951569c86e_b.jpg

50582523896_0432022d1e_b.jpg

50581790443_79770f8938_b.jpg

50581790838_8b89707e9c_b.jpg

50581789233_dc15992a69_b.jpg

50582647462_656be86341_b.jpg

50582524746_b62ccb3d8b_b.jpg

50582524966_f88580459d_b.jpg

50582648372_1db732df8a_b.jpg

50581792388_bc4639bb92_b.jpg

50582526516_2107d851d0_b.jpg

50581792893_281ef69ee9_b.jpg

50582526786_5ca11f1039_b.jpg

50582645782_e5afd1413a_b.jpg

50582645857_b2f6568d23_b.jpg

50582523266_4b8fac2b67_b.jpg
 
Last Town Hall for the crosstown lrt (Don Mills to Kennedy portion) starts in 20 minutes. ASK THE TOUGH QUESTIONS!!

 
Last Town Hall for the crosstown lrt (Don Mills to Kennedy portion) starts in 20 minutes. ASK THE TOUGH QUESTIONS!!

Like what?
 
If they can reach the frequency they claim (every 3-5 minutes), maybe the shelters are not so important...But who knows
 
Nov 06
Don Mills and Eglinton Intersection been place back to what it was before construction stated. Last of the lanes to the east being pour with the rest of the area waiting asphalting.

Only the southbound Don Mills lanes and Eglinton lanes need to be built that will connect to the west-east section already done.

Overhead in place from DVP to Laird Dr including the station by the looks of things.
50587428276_5c53ffb020_b.jpg

50587551537_f47488c3f8_b.jpg

50586686778_fbb949ff2b_b.jpg

50587552592_ba514ecab1_b.jpg

50587429991_8412fd6f75_b.jpg

50587430306_bf39821997_b.jpg

50587553557_39814dbf8e_b.jpg

50587553717_57d025d0dc_b.jpg

50587553857_dfef6901e3_b.jpg

50586688123_76e3deb9fd_b.jpg

50587554877_e592af179a_b.jpg

50586689818_7d59c5bf34_b.jpg

50586690213_f5a19404e3_b.jpg

50587433306_39f5640846_b.jpg

50587433381_065672a2ea_b.jpg

50586690748_85487e9816_b.jpg
 

Back
Top