Did some shooting in the east end for the first time in months, with some major changes to very little.
Don Mills and Eglinton intersection should be back to normal by year end depending on traffic light for final setting. The west side is pave and waiting striping. The east side is seeing the last 2 westbound lanes pour that will be pave over along with the pour lanes at Don Mills. Once they pave the Don Mills northbound lanes on both side of the intersection as well the new Eglinton lanes, they can fix the southbound lanes including the Eglinton intersection.
New temporary traffic lights being install where TTC buses turn on to Eglinton by Kennedy Station to allow Eglinton Lanes to move back to where they should be. The north side of Eglinton at Kennedy Rd partly moved back to where it used to be along with sidewalks and driveway on the west side.
East of Sinnott Rd to the west side of Victoria Park has the overhead system in place, including the 3 areas where trains can transfer one track to another. From the west side of the DVP to just before Laird Dr, overhead in place.
Neither portal has track or overhead in place. West side of Victoria Park to the west side of DVP have no overhead support brackets on the columns.
About 50% of the tracks in place and about 40% of the stations are built. Some stations have glass handrail is various locations on the platform.
I will leave info for some stations in the stations threads.
Photos to follow.