crs1026
Superstar
^That video shows LRV 6225 in operation. That’s at least a third of the LRV’s on hand. Well on the way to having sufficient for opening day. No rush yet ;-)
- Paul
- Paul
I think the report states the technology for enhanced TSP will only be used when vehicles are behind schedule. I recall a similar use of TSP on the VIVA Rapidways.Could apply to the Eglinton Crosstown.
I think the report states the technology for enhanced TSP will only be used when vehicles are behind schedule. I recall a similar use of TSP on the VIVA Rapidways.
This makes me really want a public transit route on the midtown corridor. Something about a metro train running over that bridge just looks right.Think I saw some new vehicles being delivered today. Looking south at Summerhill Station
View attachment 279866
I did a quick estimate on how much it would cost to build the missing link and a set of parallel tracks for CP based on the amount of new grade crossings needed to free up the Midtown section.Have there ever been any ridership studies/estimates, no matter how vague, for the Midtown route? Would be really interesting to have even a ballpark figure...
@Nadnev is the time traveler showing us that Midtown transit will happen in at least one timeline![]()




