Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

Think I saw some new vehicles being delivered today. Looking south at Summerhill Station

image.jpg
 
Have there ever been any ridership studies/estimates, no matter how vague, for the Midtown route? Would be really interesting to have even a ballpark figure...

@Nadnev is the time traveler showing us that Midtown transit will happen in at least one timeline ;)
I did a quick estimate on how much it would cost to build the missing link and a set of parallel tracks for CP based on the amount of new grade crossings needed to free up the Midtown section.
Somewhere in the range of 30$B if that section is quad tracked to keep CP and CN traffic separate.

5-6$B if CP and CN are ok with running their traffic together on two lines.

 