News   Dec 17, 2025
 699     1 
News   Dec 17, 2025
 512     0 
News   Dec 17, 2025
 465     0 

Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

This line will only be able to have frequencies of every 4 minutes each way max as opposed to a grade separated line that could run every 90 seconds and be cheaper to run due to automation. When considering the huge cost of this project, LRT was the slowest, most unreliable, lowest capacity, lowest frequency, and most expensive system to run they could have thought of.
4 to 5 minute headways is the current spacing for the subways. I have no idea how 90 second headways would work unless you are going to run empty vehicle as it takes poel time to get on and off of them. The surface stops may take less time to load ad unload then the stations will though but I relly don't think we will ever see any heady ways lower then 4 or 3 minutes between trains.
 
4 to 5 minute headways is the current spacing for the subways. I have no idea how 90 second headways would work unless you are going to run empty vehicle as it takes poel time to get on and off of them. The surface stops may take less time to load ad unload then the stations will though but I relly don't think we will ever see any heady ways lower then 4 or 3 minutes between trains.

I've never seen the traffic lights on Eglinton Avenue be red longer than 3 minutes. Maybe a minute it is red to allow cross traffic go through.
 
I don't know why they wouldn't program the lights to coordinate in a way that trains always get a green. (Synchronized green) As long as each train dwells within a reasonable timeframe. This would already allow trains within 2-3 minute headway to operate normally. I'm pretty sure St Clair is programmed like this.

The next addition would be detection loops. They would be placed right after the platform. This would inform the upcoming traffic signal that a train is coming. It will assume when the train will arrive within X seconds based on speed limit and distance (usually would be up to a minute since it's a block away). The traffic controller would by dynamic and give priority to the LRT over traffic. The controller will determine if the request can be granted or not by extending a the green phase or shorting the red phase of the perpendicular road. Theoretically the operators could know if they would see a green or a red if they install a device or program the cab signal to tell them.
This method is already tested: the https://www.transit.dot.gov/sites/f...TRB-APTA_Green-Line-Signal-Priority_rev02.pdf
Note: this isn't the same type of TSP we have here where streetcars roll up to the intersection and the controller only have a second to determine a streetcar has arrived. The point is not to approach a red and shorted the time but to ensure a green phase is available. 2 minutes should be quite doable with good TSP. 90 seconds is quite difficult to achieve even with full grade separation.

The LRT can get full priority at Minor/midblock. If a train is detected coming, they should wait. Aren't we all tired of seeing a bunch of cars arriving after a large gap at a minor traffic signal to see it turn red for one car to make a left. If they ever decide to do such a thing on Spadina, we wouldn't have streetcars waiting at Sussex, Willcocks, Nassau, Sullivan and etc. It can even help space out bunching by not giving priority behind it.
 
One more thing about synchronized green. They might not able to coordinate both directions as they have different stopping patterns. Dwelling time is longer in the peak direction and platform/signal spacing is different. Of course they should ensure the peak demand direction have the synchronized green. That means Eglinton to Kennedy might take longer than Kennedy to Eglinton in AM rush by a few minutes.

The EA analysis saying "Probability of a LRV Clearing on Green with Zero Signal Delay" is 30-35% (depending on intersection) of the time is completely BS. That is when no TSP is used and when a train randomly arrives. I really hope ML and Crosslinx consortium actually studied other cities and have priority over the city transportation planners. I'm betting city will screw this up and not realize other cities already have a better solution already in use. We don't need another Spadina or St Clair.
 
The at-grade Eglinton East section of the Crosstown is something Toronto will regret for a very long time.
I doubt it. I'd think that if it was going to be underground the whole way, it would have stopped at Don Mills, and we'd be waiting years for Phase 2.

If we'd done Sheppard as underground from Yonge to Don Mills, and then at surface from Don Mills east, they have extended it to Scarborough by now! Though obviously the vehicle technology would have been different. Heck, perhaps it would have been longer to begin with, if the stations were only 2/3 of the length. (well they are, but they paid the full amount for full stations, and then just built temporary walls, to make them look smaller).
 
I never said anything about a tunnel as a replacement. It's amazing how Torontonians still think grade separated transit has to mean underground. Elevation is the only option except perhaps a trench.

In LA, Edmonton, Calgary, Minni and most other cities building rapid transit LRT do so with 100% train priority which can include real train crossing barricades.
 
You are quite correct {and I have changed my post} as I meant to say TC was based on Toronto reaching 3 million by 2030 but now will probably hit 3.5 million. I appreciate you pointing that out.

Based on Toronto's recent growth, the chances of it reaching 3.5 Million by 2030 are slim. The city (proper) isn't growing as fast as it used to.
 
I doubt it. I'd think that if it was going to be underground the whole way, it would have stopped at Don Mills, and we'd be waiting years for Phase 2.

If we'd done Sheppard as underground from Yonge to Don Mills, and then at surface from Don Mills east, they have extended it to Scarborough by now! Though obviously the vehicle technology would have been different. Heck, perhaps it would have been longer to begin with, if the stations were only 2/3 of the length. (well they are, but they paid the full amount for full stations, and then just built temporary walls, to make them look smaller).

Exactly. And is what Steve Munro is quoted as saying thirty years ago. Basically if it's built as heavy subway, it will be forever cut short (and thus far less transit riders will be served). And he was right. Which is why he proposed something like LRT that's underground between Yonge and Don Mills and at grade well into Scarboro. Hence why it's annoying/disheartening to see asshats try and claim he's some kind of anti-borough ghoul.

And I agree that if the subway was built with stations only 100m (i.e 4-car) that the savings would be enough to get it further in its first phase (maybe Vic Pk), and improve the biz case to actually finish the bloody thing.
 
From a Facebook group (posted with permission)..... specialwork panels are being delivered to the maintenance facility.

- Paul

Screen Shot 2017-06-29 at 4.26.13 PM.png
 

Attachments

  • Screen Shot 2017-06-29 at 4.26.13 PM.png
    Screen Shot 2017-06-29 at 4.26.13 PM.png
    542.8 KB · Views: 560
Good to see they're on track. They claim to have the MSF up and running by 2019 with track installation starting this year.
 
It most likely will be since you can track subway trains, buses, streetcars, and GO trains. So why would LRVs be the exception?
Actually so far only the TTC has enabled the tracking data to be open to the public via next bus and it';s only available for the buses and streetcars as they are all outfitted with GPS the subways don't have GPS on them although even if they did it wouldn't be much good as the spend about 90% of the time underground. As far as I know Metrolinx doesn't share that data publicly so there is no real time tracking available in an app or from a website yet for either go trains or go buses.
 
As far as I know Metrolinx doesn't share that data publicly so there is no real time tracking available in an app or from a website yet for either go trains or go buses.

And once again, you're wrong.

The trains have been trackable in real time for several years, first from GO's own website - http://gotracker.ca/gotracker/web/ - and for the past little while using third-party systems like Transee: https://www.transsee.ca/routelist?a=gotransit.

The buses are GPS-equipped, and they did do a test a while ago with buses on one route being publicly accessible, but they are still trying to figure out the best way to make that data available publicly across the whole of the network.

Dan
Toronto, Ont.
 

Back
Top