13K   5   39 
SXSW 1
share  tweet  share 
  13 renderings
SXSW1 includes Building A: the 23-storey Tower 1 and the 33-storey Tower 2.

RESORT LIVING ON THE RAVINE

Esteemed GTA builder Primont is proud to introduce Hillmont, the next phase in resort living at the master-planned community of SXSW at Islington and Highway 407 in Vaughan. Hillmont’s two design-forward condominium towers offer spectacular views of the lushly forested ravine below. Unlike other master-planned communities, the 42-acre SXSW site encompasses 30 acres of designated ravine.

With large balconies that make open-air living effortless and close proximity to trails and green space, residents are free to revel in the great outdoors. Indoors, every suite is a perfect retreat, with luxurious style and an array of elegant, modern features and finishes. The interior design by figure3 reflects the incredible natural ravine setting, drawing you in with warmth and beauty, and conjuring a feeling of comfort and tranquility.

From the moment you step into Hillmont’s double-height lobby with its soaring ceilings, stunning wood feature wall and marble concierge desk, you’re immersed in a world of lavish design. No details have been spared in creating spaces that draw you in and transform your spirit.

The rich amenities include a coffee bar and lounge; marble and wood-hued lobby bar and social room; fully equipped fitness facility; comfortable Think Space; outdoor terrace with BBQs; fireplace lounge, and Zoom room.

A new community park will provide many options for recreation and relaxation. Experience the serenity of the ravine lookout, or shoot hoops on the basketball court. There’s a kids’ play zone, natural hiking trails, and a bocce court.

A wonderful resort-style exclusive perk, free shuttle service takes you in minutes to Vaughan Metropolitan Centre (VMC) subway station and to York University. From VMC, it’s just 45 minutes to Union Station.

With a 50-year tradition of fine home building, Primont is committed to providing the highest quality and value to all homebuyers.

Find out how to promote this project on UrbanToronto
Expand/Collapse All   |   Export CSV
Project Information
Full data set available with a UTPro subscription
Earliest Application Date 0000-00-00 Construction Status Under Construction
Category Residential (Townhouse, Condo), Public Space / Park Construction Began 0000-00-00
    Completion Date 0000-00-00
Address 7082 Islington Ave, Vaughan, Ontario, L4L 1V8 Other Addresses XXX XXXXXX XX, XXX XXXXXX XX
Latitude XXXXXXXXX Longitude XXXXXXXXX
Region XXXXXX Ward XX
MLS Zone XX    
Field Updates
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX'.

XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX

XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX
Project Attributes
Full data set available with a UTPro subscription
FAR/FSI XXXXXX Crane Number XX
Site Area XXXXXX XX Heritage XXX
Number of Buildings 1    
Maximum Height 357 ft / 108.75 m    
Maximum Storeys 33    
Underground Levels X    
Project Companies
Developer Primont Homes
Builder Primont Homes
Architect BDP Quadrangle
Architect of Record BDP Quadrangle
Landscape Architect NAK Design Strategies
Interior Designer Figure3
Commissioning EQ Building Performance Inc.
Engineering Rebar Enterprises Inc, Urbantech Engineering Inc
Excavation Astro Excavating Inc.
Marketing & Press The Brand Factory
Planning Weston Consulting
Realtor/Sales Baker Real Estate Incorporated
Site Services Astro Excavating Inc.
Other NEEZO Studios
Units
Full data set available with a UTPro subscription
Total Number Of Units 568 Total Rental Units XXX
Building Units 568 Hotel Units XXX
Market-Rate Rental Units XXX Freehold Units XXX
Condo Units XXX Other Units XXX
Unspecified Tenure Units XXX Affordable Rental Units XXX
    Rental Replacement Units XXX
Unit Mix
Full data set available with a UTPro subscription
Studios XXX    
1 Bedrooms XXX    
2 Bedrooms XXX    
3+ Bedrooms XXX    
Gross Floor Area
Full data set available with a UTPro subscription
Total GFA XXXXXX XX Office GFA XXXXXX XX
Commercial GFA XXXXXX XX Residential GFA XXXXXX XX
Industrial GFA XXXXXX XX Retail GFA XXXXXX XX
Institutional GFA XXXXXX XX    
Parking
Full data set available with a UTPro subscription
Total Vehicular Parking XXX Office Parking XXX
Residential Parking XXX Industrial Parking XXX
Visitor Parking XXX Institutional/Other Parking XXX
Retail Parking XXX    
    Bike Parking XXX
Access and Services
Full data set available with a UTPro subscription
Road Access XXXXXX XXXXXX Mass Timber XXX
Municipal Water XXXXXX XXXXXX Green Standards XXXXXX
Municipal Sanitary Sewers XXXXXX XXXXXX LEED Certified XXXXXX
Municipal Storm Sewers XXXXXX XXXXXX Passive Home Certified XXX
Other (Septic) XXXXXX XXXXXX    
Minimum Setbacks
Full data set available with a UTPro subscription
Front Lot Line Direction X Side Lot Line 1 Direction X
Front Lot Line Existing XXXXXX Side Lot Line 1 Existing XXXXXX
Front Lot Line Proposed XXXXXX Side Lot Line 1 Proposed XXXXXX
       
Rear Lot Line Direction X Side Lot Line 2 Direction X
Rear Lot Line Existing XXXXXX Side Lot Line 2 Existing XXXXXX
Rear Lot Line Proposed XXXXXX Side Lot Line 2 Proposed XXXXXX
Applications
Full data set available with a UTPro subscription
Primary Approval XXX
Submission Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
DevApp URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Application Types XXXXXX XXXXXX XXXXXXXXXXXX
XXXXXX XXXXXX XXXXXXXXXXXX
OLT URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Approval Status XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Council Decision URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Approval Sub-Status XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Application #s XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Council Decision Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
OLT #s XXX: XXXXXX
XXX: XXXXXX
XXX: XXXXXX
Appeal Received Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
MZO #s XXX: XXXXXX
XXX: XXXXXX
XXX: XXXXXX
OLT Decision Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
   
MZO Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
   
Permits
Full data set available with a UTPro subscription
Links
Full data set available with a UTPro subscription
Website XXXXXXXXXXXXXXXXXX Registration XXXXXXXXXXXXXXXXXX
Email sxsw@bakersales.info Social Media XXXXXXXXXXXXXXXXXX
Other XXXXXXXXXXXXXXXXXX    
Documents
Full data set available with a UTPro subscription
XXXXXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXX XXXXXXXXX-XX-XX
XXXXXXXXXX XXXXXXXXXXXXX-XX-XX
XXXXXXXXXXX XXXXXXXXXX-XX-XX
XXXXXX XXXXXXXXXXX-XX-XX
XXXXXXXX XXXXXXXXXXXXXX-XX-XX
XXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXXX XXXXXXXXXX-XX-XX
XXXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXXX XXXXXXXXXXXXXXX-XX-XX
Something is not right? Let us know!
Forum
Buildings Discussion
Views: 18K  |  Replies: 34  |  Last Post: Apr 08, 2026

Member Photos  
  39 photos

News