Ontario Line: Maintenance & Storage Facilitysub project

Developer: Metrolinx
  
Address: Yonge and Queen, Toronto
Category: Transit
Status: ConstructionCrane(s): N/A
Height: ? ft / ? mStoreys: ? storeys
Project Forum 24K posts
Real Estate Forum
Follow 26 followingUpload 1.1K photos
Official WebsiteReport Error

The Ontario Line Maintenance & Storage Facility, Toronto, designed by Arcadis and Connect 6ix for Metrolinx
  3 renderings
The Ontario Line Maintenance & Storage Facility, Toronto, designed by Arcadis and Connect 6ix for Metrolinx

The Ontario Line Maintenance & Storage Facility: a 2-storey maintenance, storage, operational logistics and office facility designed by Arcadis and Connect 6ix for Metrolinx where trains will be housed and maintained for operation on the Ontario Line. The facility will be located on the west side of Village Station Road, north of Millwood Road between Science Centre Station and Thorncliffe Park Station.

Address 50 Village Station Rd, Toronto, Ontario, M4H 1A2
Category Commercial (Office, Industrial), Transit
Status Pre-Construction
Number of Buildings 1
Height 52 ft / 15.70 m
Storeys 2

Developer Metrolinx
Architect Arcadis
Landscape Architect Arcadis
Engineering Arcadis

Forum
Buildings Discussion
Views: 1K  |  Replies: 4  |  Last Post: Dec 23, 2024

Member Photos  
New and improved UTPro data tool now available!
BESbswy