Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

They have finished the dog area. Taken 1 March.

IMG_7835.jpeg

IMG_7836.jpeg
 
March 4: Finally, the last remaining external construction hoist, for the Tridel condominium building at the north-west corner of The Well, is coming down. The hoist was retained long after its normal construction use had been completed - the hoist was being used to lift the large refrigerators and the kitchen island and counter top slabs that would not fit into the building's internal elevators up to their suites. Now the west wall sections which had the hoist entry points can be sealed up and the interiors of the associated units finally be completed.

1000003575.jpg


20240304_135941.jpg
 
March 4: Finally, the last remaining external construction hoist, for the Tridel condominium building at the north-west corner of The Well, is coming down. The hoist was retained long after its normal construction use had been completed - the hoist was being used to lift the large refrigerators and the kitchen island and counter top slabs that would not fit into the building's internal elevators up to their suites. Now the west wall sections which had the hoist entry points can be sealed up and the interiors of the associated units finally be completed.

View attachment 545603

View attachment 545602
Amazing construction industry commentary as always :)
 
Retail vacancy is lower overall in the market and heading down to 4%, as per CBRE's market outlook presentation from a couple weeks back. This bodes well for well located retail such as the retail coming to The Well.

EDIT: saying "well" three times was entirely accidental.
 
Last edited:
March 14 - The final major section of exterior wall cladding of The Well project, the Tridel condominium building at the north-west corner, filling in the missing pieces where the external construction hoist used to be, is now being installed.

20240314_112432.jpg
20240314_112414.jpg
 

Attachments

  • 20240314_112403.jpg
    20240314_112403.jpg
    274 KB · Views: 6
Frank + Oak is now open and La Plume is hosting private events in anticipation of imminent opening. The Fix Bikes Café is looking substantially complete. Finally the hoarding is gone from the western edge so should see the passage to Draper open soon as well as the community space. Taken 18 March.


IMG_8828.jpeg
IMG_8829.jpeg
IMG_8830.jpeg
IMG_8831.jpeg
IMG_8832.jpeg
IMG_8833.jpeg
IMG_8834.jpeg
IMG_8835.jpeg
IMG_8836.jpeg
IMG_8837.jpeg
 

Attachments

  • IMG_8817.jpeg
    IMG_8817.jpeg
    215.5 KB · Views: 10
Last edited:

Back
Top