Toronto INDX Condos | 178.6m | 54s | Lifetime | P + S / IBI

A couple of tip top of the building shots, with a little more cladding in place:

DSC01274.jpg
DSC01280.jpg


42
 

Attachments

  • DSC01274.jpg
    DSC01274.jpg
    330.4 KB · Views: 3,321
  • DSC01280.jpg
    DSC01280.jpg
    290.5 KB · Views: 3,303
Tried to snag some pics on the weekend from a few new(er) perspectives; really starting to show some prominence.

upload_2016-4-18_11-48-13.png


With bonus EY Tower shots:
upload_2016-4-18_11-48-33.png


upload_2016-4-18_11-48-42.png


upload_2016-4-18_11-48-49.png


upload_2016-4-18_11-48-55.png


The juxtaposition between the designs of this and the EY Tower are really growing on me; they're quite different but somehow complementary:
upload_2016-4-18_11-49-48.png
 

Attachments

  • upload_2016-4-18_11-48-13.png
    upload_2016-4-18_11-48-13.png
    1.3 MB · Views: 3,183
  • upload_2016-4-18_11-48-33.png
    upload_2016-4-18_11-48-33.png
    1.1 MB · Views: 3,205
  • upload_2016-4-18_11-48-42.png
    upload_2016-4-18_11-48-42.png
    1.1 MB · Views: 3,159
  • upload_2016-4-18_11-48-49.png
    upload_2016-4-18_11-48-49.png
    1.2 MB · Views: 3,165
  • upload_2016-4-18_11-48-55.png
    upload_2016-4-18_11-48-55.png
    1.2 MB · Views: 3,173
  • upload_2016-4-18_11-49-48.png
    upload_2016-4-18_11-49-48.png
    970.6 KB · Views: 3,130
Looking good.

IMG_8632.JPG
IMG_8633.JPG
IMG_8635.JPG
 

Attachments

  • IMG_8632.JPG
    IMG_8632.JPG
    267 KB · Views: 2,922
  • IMG_8633.JPG
    IMG_8633.JPG
    236.1 KB · Views: 2,952
  • IMG_8635.JPG
    IMG_8635.JPG
    244.6 KB · Views: 2,930
Indx felt deserted today thanks to the drywall union strike while doing our final delivery until strike is over (HVAC). No more suite orders at any of our sites until they come to agreement.

We're going be screwed when the strikes over since works going be accelerate and there going want so much material, not enough trucks
 

Back
Top